27 - 007 CM at RISK - Carter ES Renovations

Active 27-007 CM at RISK - Carter ES Renovationis RFPConstruction - BuildingBibb County School District
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Bibb County School District (Georgia) posted this RFP on Nov 17, 2026. Responses are due Dec 22, 2026. Category: Construction - Building. Questions are due 2026-12-08 09:00. Solicitation number 27-007 CM at RISK - Carter ES Renovationis.

Solicitation details

General information

Solicitation number
27-007 CM at RISK - Carter ES Renovationis
Notice type
RFP
Place of performance
Georgia
Questions due
2026-12-08 09:00

Agency and category

Agency
Bibb County School District
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The BIBB COUNTY SCHOOL DISTRICT (Owner) is requesting submittals from qualified construction management firms licensed as general contractors in Georgia for the renovation of the SONNY CARTER ELEMENTARY SCHOOL. If your firm is experienced in similar type and size projects, you are requested to submit your qualifications for consideration and an opportunity to submit a fee proposal for construction management service for the project.

The facility is a one-story building consisting of approximately 62,108 sq. ft., located at 5910 Zebulon Road, Macon, GA 31210. The project scope includes upgrades to flooring and finishes, classroom and administration furniture, hardware, playground equipment, security, electrical, plumbing, kitchen equipment, and partial HVAC replacement. [...] Construction must be completed no later than **July 21, 2027**.

The preliminary renovation budgets of the combined projects are estimated at **$6,000,000.00**.

Scope

The Construction Management services shall include a Pre-construction Design Phase and a Construction Phase. The CM will provide comprehensive administration and management of all aspects of the construction of the project and will work in concert with the A/E towards the successful completion of the project on schedule, at or less than budgeted costs, meeting or exceeding standards stipulated by the construction documents, and in adherence with standards required by local authorities and other agencies having jurisdiction.

The CM, either through in-house staff or outside consultant/contractors, will serve as a construction manager/contractor and provide all construction services and activities necessary for the design, construction and occupancy of the project.

Pre-Construction Design Phase Services

  • Validate preliminary construction budget in regard to the approved program.
  • Participate in design team meetings and presentations as required to facilitate the design process.
  • Evaluate construction documents for constructability, maintainability, potential problems, errors and compliance with the construction budget.
  • Provide cost estimating, cost management, value analysis, value engineering and peer review.
  • Develop construction budget to be maintained throughout design and construction.
  • Develop a GMP upon substantial completion of the documents.

Bidding and Award Phase Services

  • Provide input on division of construction activities into separate bid packages.
  • Pre-qualification of potential contractors and vendors.
  • Advertise and distribute bidding documents.
  • Receive and analyze bids for presentation to the project team.
  • Contract with successful bidders for construction.

Construction Phase Services

  • Develop requirements for safety, quality assurance, and schedule adherence.
  • Maintain on-site staff for construction management.
  • Prepare and submit change order documentation for approval of the Architect and the Owner.
  • Monthly certification of all work in place and approval of all contractor and vendor payment requests.
  • Develop record documents for presentation to the Owner upon project completion.

Warranty Phase Services

  • Resolution of remaining "punch-list" items.
  • Monitor, coordinate and resolve all warranty complaints to the satisfaction of the Owner during the one-year general warranty period.

Additional information

Submission

All proposals should be submitted to the BIBB COUNTY SCHOOL DISTRICT via **Bonfire** at https://bcsdk12.bonfirehub.com/portal/?tab=login. Submittal will not be accepted via facsimile. Submittals will be received until 12/22/2026 at 09:00 am, EST. No submittals will be accepted after the time stipulated.

Any questions in regard to this Request shall be submitted in writing to the School District via EUNA/BONFIRE. Attendance at the pre-proposal meeting is a **mandatory** prerequisite to submitting a proposal. A representative from your company is **required** to visit the site to confirm conditions before submitting a proposal.

The fee proposal is to be submitted using *Attachment A – Construction Management Fee Proposal Form* (submit in a sealed envelope).

Scoring

  • Base Proposal of Lump Sum Price: 25%
  • Offeror / Company Overview: 15%
  • Related Experience: 20%
  • Qual/Exp. Personnel: 20%
  • Offeror's Project Approach: 20%

Bonds

Payment and performance bonds satisfactory to the Owner each in the amount of **100% of the contract sum** will be required of the successful offeror to guarantee delivery of completed work under the contract and payment for labor and materials. No contractor, regardless of size or financial rating, will be allowed to write its own bonds.

Documents

5 files

Subscribe to get these 5 documents.

  • Bid Forms EMW.pdf
    Download
  • Davis Bacon - Bid Information emwb 02112022 (15).pdf
    Download
  • General Terms and Conditions Updated Feb EMW (11).pdf
    Download
  • Legal Compliance Letter 2026.11.16 RFP CMAR Renovation to Sonny Carter ES.pdf
    Download
  • RFP 27-007 CM@Risk - Carter ES 2026.11.16 FINAL (002).pdf
    Download