General Construction Services For Campus Enclosure - Phase Two

Active PE-55046-NONST-2027-000000030 RFPConstruction - BuildingMuscogee County School District
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Muscogee County School District (Georgia) posted this RFP on Nov 19, 2026. Responses are due Jan 6, 2027. Category: Construction - Building. Solicitation number PE-55046-NONST-2027-000000030.

Solicitation details

General information

Solicitation number
PE-55046-NONST-2027-000000030
Notice type
RFP
Place of performance
Georgia

Agency and category

Agency
Muscogee County School District
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Sealed proposals for general construction services for Campus Enclosure - Phase Two, (the “Project”), at the following schools: Brewer (Gym), Clubview Elementary School (Gym and Playground), Dimon Elementary School (Gym), Kendrick High School, and Midland Middle School (Gym), Reese Road Elementary School (Gym), Richards Middle School, Waddell Elementary School (Gym), and Veterans Memorial Middle School, will be received by the Muscogee County School District (the “School District”), in the Office of the Director of Construction at the 5661 Lorenzo Road, Columbus, Georgia 31904 [...].

The Project is to be performed pursuant to the *AIA A133-2019 Standard Form of Agreement* with payment based on the Cost of Work, plus a fee and with a guaranteed maximum price. The successful proposer, the Construction Manager at Risk (CM) shall serve as the contractor and construction manager for the Project.

Scope

The project might include all typical construction trades, including mechanical, electrical, plumbing, demolition, painting, other finishes, as well as ADA compliance work and local ordinance compliance work for each campus and is mainly to provide metal and masonry fence to secure the perimeter of each campus. The services will consist of pre-construction and construction services which may proceed concurrently. Pre-construction services include cost estimating, constructability analysis and scheduling and phasing of the work. The CM will assist the School District and the Project Architect in finalizing the phasing and scheduling of the work, and value engineering of the Project. Substantial Completion shall occur as soon as possible, but no later than **Saturday July 24, 2027**.

The CM will begin by performing pre-construction services with the Project Team. Services will include conceptual and detailed budgeting and estimating, constructability reviews, evaluation of alternative materials and equipment and systems for performance of the work. The CM will work with the School District to finalize the scheduling of the work. As design proceeds, the CM will also conduct a review of the plans and specifications for completeness and cost effectiveness of the details and materials shown for the work. [...] On completion of the plans and specifications, or at an earlier date if mutually agreed upon, the CM will develop the GMP for the Project. Provided that the GMP is equal to or less than the School District’s approved budget, the contract amount (GMP) will be established and construction may proceed. The contract will be for the cost of the work plus a fee, with a guaranteed maximum amount.

2WR of Georgia, Columbus, GA. is the Project Architect.

Additional information

Proposals are received in the Office of the Director of Construction until **2 p.m., Wednesday January 6, 2027**. Proposals received after this time will not be accepted. Submit one (1) original and six (6) identical copies of the proposal. The proposals shall be in a loose-leaf binder with tabs clearly identifying the contents.

A Mandatory Pre-Proposal Conference will be held; if you do not attend, your proposal will not be accepted.

The evaluation factors for the RFP and their relative importance are as follows:

  • Stability of CM (20%)
  • Relative Experience and Qualifications of CM (20%)
  • Quality of Proposed Management Plan (15%)
  • Past Performance of CM (20%)
  • Fee of CM (25%)

The proposal must include a signed *Statement of Assurance and Non-Collusion Affidavit* (Exhibit ‘A’) and a *Contractor Affidavit and Agreement* (Exhibit ‘B’). Proposals must remain in effect for at least 45 (forty-five) days after date of receipt.

Satisfactory proof that the proposer will be able to furnish **100% Performance and Payment bonds** at the execution of the contract (Letter from Surety Company) is required.

If awarded the contract, the CM is required to have the following insurance coverage:

  • Workers Comp: Statutory
  • General Liability: **$1,000,000**
  • Automobile Liability: **$1,000,000** Combined Single Limit
  • Excess Liability Umbrella: **$5,000,000**
  • Builder’s Risk: 100% of the Contract Amount (GMP)

Documents

1 file

Subscribe to get this document.

  • RFP for Campus Enclosure CM Phase 2.pdf
    Download

Similar open bids

In Georgia

More from Muscogee County School District

Open bids