City of Sandy Springs (Georgia) posted this RFQu on Nov 16, 2026. Responses are due Dec 15, 2026. Category: Environmental Services. Questions are due 2026-11-30 17:00. Solicitation number PE-66098-NONST-2027-000000159.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City is seeking submissions from highly qualified contractors to provide Stormwater Repair, Maintenance, and Inspection Services throughout the City, as directed. The successful Respondent ("Contractor") will provide scheduled maintenance, upkeep, and operation of City owned facilities.
To comply with the City's state MS4 permit, the City or its designee must inspect 20% of the City's infrastructure each year. That is approximately 2,500 pipes and structures or over two hundred (200) per month. Inspections will be tracked monthly with the total completed reported in a monthly report.
Storm System Maintenance
Storm System Inspections
Pond Vegetation Cutting and Removal
Provide vegetation cutting and removal services up to four (4) times a year based on the list of the City's detention ponds that will be provided during the ITB process. Services shall include all equipment and labor required to complete the scope of services.
Emergency Response Services
The contractor shall provide crews on a twenty-four (24)-hour, on-call basis to respond to incidents, emergencies, and weather-related emergencies within the City of Sandy Springs. The maximum response time shall be two (2) hours.
The City of Sandy Springs ("City") uses a procurement portal powered by Bonfire Interactive ("Bonfire") for accepting and evaluating bids, statements of qualification, responses and proposals digitally. A response submitted ("Response") in any other format (e-mail, paper, fax, mail, etc.) will not be accepted for any reason.
This RFQC uses a two-phase procurement process. Phase I evaluates contractor qualifications on a Pass/Fail basis without pricing. Phase II will be an Invitation to Bid (ITB) limited to contractors determined responsive and responsible under Phase I.
Phase I Responses must be submitted electronically through Bonfire by the deadline stated in the Schedule of Events.
**Mandatory** minimum qualifications for Phase I include current GDOT prequalification in Drainage Rehabilitation, Repair, Replacement, and Miscellaneous Maintenance, and at least five (5) years of firm experience on projects of similar scope and complexity.
Unless otherwise stated in this RFQC or permitted by applicable law, Responses shall remain valid for one hundred twenty (120) days after the applicable submission deadline.
Within 10 days of Notice of Award, and at all times that this Contract is in force, the Contractor shall obtain, maintain and furnish the City Certificates of Insurance from licensed companies doing business in the State of Georgia with an A.M. Best Rating A-10 or higher and acceptable to the City.
Subscribe to get these 3 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.