Chatham County (Georgia) posted this ITB on Nov 9, 2026. Responses are due Dec 15, 2026. Category: Construction - Building. Solicitation number 26-0140-5.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Work shall consist of furnishing all material, labor and equipment for the new Oglethorpe Mall replacement library.
New construction of a public library facility, including architectural, structural, civil, landscape, engineering, and associated site development improvements as indicated in the Contract Documents.
New construction of a public library facility, including architectural, structural, civil, landscape, engineering, and associated site development improvements as indicated in the Contract Documents.
Project will be constructed under a single prime contract.
**Project Location:** 1120 Eisenhower Drive, Savannah, GA 31406
**Owner:** Chatham County, Georgia on behalf of Live Oak Public Libraries
**Architect:** Gunn Meyerhoff Shay Architects, PC
The undersigned Bidder agrees to execute a contract for this Work in the above amount and to furnish surety as specified within 10 days after a written Notice of Award, if offered within 60 days after receipt of bids, and on failure to do so agrees to forfeit to Owner the attached cash, cashier's check, certified check, U.S. money order, or bid bond, as liquidated damages for such failure, in the following amount constituting five percent (5%) of the Base Bid amount above.
All provisions and requirements of the Chatham County Procurement guidelines as published with the Invitation to Bid apply to this Bid. Failure to comply with those requirements may result in disqualification of this Bid.
The following form of Owner/Contractor Agreement and form of the General Conditions shall be used for Project:
Form of Performance Bond and Labor and Material Bond: *AIA Document A312*, "Performance Bond and Payment Bond."
Form of Certificate of Insurance: *AIA Document G715*, "Supplemental Attachment for ACORD Certificate of Insurance 25-S."
Subscribe to get these 8 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.