ITB #26-171 Construction of Administrative Building Phase 2 for Clayton County, Georgia

Active PE-63100-NONST-2027-000000105 ITBConstruction - BuildingClayton County
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Clayton County (Georgia) posted this ITB on Nov 12, 2026. Responses are due Dec 22, 2026. Category: Construction - Building. Solicitation number PE-63100-NONST-2027-000000105.

Solicitation details

General information

Solicitation number
PE-63100-NONST-2027-000000105
Notice type
ITB
Place of performance
Georgia

Agency and category

Agency
Clayton County
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

This Invitation to Bid (ITB) is for qualified General Contractors hereinafter referred to as Bidder or Bidders for the Construction of Administrative Building Phase 2 for Clayton County, Georgia. The detailed Specifications are set forth in this ITB.

The Project consists of the construction of a three-story office building (core & shell plus interior fit-out).

Scope

Work covered by Contract Documents

The Work of Project is defined by the Contract Documents and consists of the following:

  • All structural components.
  • All exterior finishes.
  • All mechanical, electrical, and plumbing components.
  • Provisions for utility connections.
  • Vertical circulation components.
  • Interior finishes as shown in Project Documents.
  • All landscape and site improvements.
  • All civil site work.
  • All security components.
  • All Audio / Visual Components
  • All furniture components

Design/Build trades and scopes of work are the sole responsibility of the Contractor. These trades include, but are not limited to, Wood Trusses, Precast Parking Deck, Swimming Pool, and Fire Suppression sprinkler system.

Include the costs associated with National Pollutant Discharge Elimination System Compliance Monitoring (NPDES) monitoring, corrective damage, and reporting. Construct mock-ups per Contract Documents, including Interior, Exterior, Corridor, and Landscape/Hardscape. This shall include the demolition and removal of the mockups.

Items noted NIC (Not in Contract) will be supplied and installed by Owner before Substantial Completion. Some items include:

  • Furnishings.
  • Small equipment.

Additional information

Project will be constructed under a single prime contract.

Please reference BidnetDirect.com via the Event Url for access to Exhibit A Project Plans.

Itemize separate line item cost for *Performance and Payment Bonds*. Submit on AIA Pay Application Form G703.

Contractor and Architect are required to use the electronic document submittal service. Paper document transmittals will not be reviewed; emailed electronic documents will not be reviewed.

The Contractor warrants that all labor and materials furnished and work performed are free from defects for a period of one year from Date of Substantial Completion.

Documents

4 files

Subscribe to get these 4 documents.

Similar open bids

In Georgia

More from Clayton County

Open bids