Mary Street Reconstruction

Active PE-66157-NONST-2026-000000016 IFBConstruction - Heavy & CivilCity of Pembroke
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Pembroke (Georgia) posted this IFB on Nov 19, 2026. Responses are due Dec 16, 2026. Category: Construction - Heavy & Civil. Questions are due no later than seven (7) days prior to date set for receipt of bids. Solicitation number PE-66157-NONST-2026-000000016.

Solicitation details

General information

Solicitation number
PE-66157-NONST-2026-000000016
Notice type
IFB
Place of performance
Georgia
Questions due
no later than seven (7) days prior to date set for receipt of bids

Agency and category

Agency
City of Pembroke
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Sealed proposals will be received by the City of Pembroke located at 353 N. Main Street, Pembroke, Georgia on **December 16, 2026, until 10:00 a.m. local time** for the Mary Street Reconstruction Project.

The work to be performed consists of furnishing all labor and materials to complete the Mary Street Reconstruction Project.

Scope

More specifically, the project will consist of roadway and utility improvements along Mary Street between Ledford Street and SR-119 in downtown Pembroke. Major project components include demolition, earthwork and grading, storm drainage improvements, waterline installation, roadway reconstruction, pavement installation, and pavement striping. Additional work includes centerline restriping of various roadways throughout the city, crosswalk striping along Payne Drive, and construction of a concrete speed table on Patrick Street.

The Contractor will be required to submit a construction schedule in writing identifying milestones and completion dates at the preconstruction conference. He shall also be required to submit a resume' of the proposed job superintendent for approval by the Engineer.

The Owner will provide horizontal and vertical control. The Contractor will be responsible for construction staking.

Additional information

Submission

Proposal shall be in opaque, sealed envelope and marked "Mary Street Reconstruction Project" and shall bear the name of the Bidder. The proposal (including Statement of Bidder's Qualifications) shall be submitted in duplicate on an exact copy of the proposal form bound herein. At the time and place noted above, the proposals will be publicly opened and read aloud.

Plans, Specifications, and Contract documents are open to public inspection at the Georgia Procurement Registry, ConstructConnect, Dodge Construction Network, and www.mesack.com. Copies may be obtained by depositing a non-refundable **$150** for each set of plans requested. Plans and Specifications must be obtained no later than five (5) working days before the bid date. No exceptions.

Requirements

Each Contractor must **prequalify** for bid by submitting a completed "Statement of Bidder Qualifications" form supplied by the Engineer. Bids will be accepted from prequalified bidders only.

Bids must be accompanied by a certified check or bid bond in an amount equal to at least **five percent (5%)** of total amount bid for the completed work. No bids may be withdrawn for a period of sixty (60) days after the closing time schedule for receipt of bids.

Bids or proposals for utility contracting work will NOT be opened or considered unless the Utility Contractor License number is written on the face of the bid or proposal.

Award and term

The Owner reserves the right to accept or reject any or all bids and to waive informalities. Award of the contract, if it is awarded, will be to the lowest responsible bidder.

The Bidder shall fully complete all work within one hundred eighty (180) consecutive days from and including said date.