City of Sandy Springs (Georgia) posted this ITB on Nov 19, 2026. Responses are due Jan 7, 2027. Category: Construction - Heavy & Civil. Questions are due 2026-12-09 17:00. Solicitation number PE-66098-NONST-2027-000000160.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Sandy Springs is seeking bids from qualified contractors for the T6026-1 North River Gap Sidewalk Project.
This project is to construct approximately 300 LF sidewalk from the existing sidewalk on the east side of North River Drive from existing sidewalk at 100 North River Drive to existing sidewalk at 501 North River Pkwy, including ADA ramps at the driveways, reconstruction of two driveways, and other associated improvements.
This project is to construct approximately 300 LF sidewalk from the existing sidewalk on the east side of North River Drive from existing sidewalk at 100 North River Drive to existing sidewalk at 501 North River Pkwy, including ADA ramps at the driveways, reconstruction of two driveways, and other associated improvements.
**Grading Complete** shall include the following provisions and their cost:
Sod
Sod installation shall include a 2 year warranty.
Bids shall only be accepted online through the Bonfire Portal at: https://sandysprings.bonfirehub.com/projects/263796/details
Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason.
All questions or requests for clarification must be sent via Bonfire under Message Vendor Discussions: https://sandysprings.bonfirehub.com/projects/263796/details
Questions and clarifications will be answered in the form of an addendum.
The City of Sandy Springs reserves the right to reject all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Sandy Springs.
**Work hours:** Work will be permitted during weekdays (Monday through Friday) between the hours of 8:00 AM and 5:00 PM.
**Liquidated damages:** charges shall be assessed against any money due or that may become due the Contractor at the rate of $500 per calendar day. Failure to provide temporary vehicular accessibility to driveway within the same day,(24-hour period) shall result in the assessment of liquidated damages at the rate of $2,000.00 per day.
Subscribe to get these 3 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.