The Annual Green Infrastructure Maintenance and Installation Program consists of:
The Work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles; and furnishing all labor, skills, transportation, insurance, permits and services, including fuel, power, water, and essential communications, and performing all work requested on an on-call basis as authorized by the City of Atlanta, Department of Watershed Management (DWM) through Work Orders issued by DWM for specific items of Work.
The anticipated construction and maintenance projects have not yet been defined and will be developed based on the needs of sewer, water, and watershed protection operations. As such, a unit price contract type has been selected to procure the work. [...] Work is required throughout the City of Atlanta and service areas.
Scope A: Maintenance Work
Prior to any initial site work, Contractor and a member from the City team must meet on site to discuss work to be completed and set expectations for work to be performed. After the site visit, Contractor will submit a written proposal outlining the work to be completed and associated costs. Routine proposals shall be submitted within five (5) business days unless otherwise directed by the City. Urgent proposals shall be submitted within twenty-four (24) hours when requested by the City.
Maintenance work covers mowing operations, shrub/tree trimming, stormwater planters, bioretention areas and bioswales, green roof, and storm-related vegetative debris response.
Scope B: Green Infrastructure Installation
Design deliverables, as applicable, include drawings, calculations, specifications, cost estimate, project schedule, permit requirements, and other documents required by the Work Authorization. [...] While construction is ongoing, on each Friday until final acceptance, the contractor will submit a report of work that was completed that week and the anticipated work for the following week.
Contractors may provide installation and stabilization services at designated facilities and other City-approved locations identified through a Work Authorization.
Scope C: Stream Bank Stabilization & Restoration
The scope of work for this project consists of stabilizing and restoring stream banks to protect sewer infrastructure and water quality. The contract will expedite stream bank stabilization work at locations of emergency sewer repairs or maintenance and at locations where sewer infrastructure collapse is imminent due to stream bank erosion.
Work on this scope includes but is not limited to stabilizing streambanks and constructing bank revetments using bioengineering and natural channel design methods. Work may also include traditional hard methods, such as gabion walls, as needed.
**Emergency Response:** Contractor shall maintain a 24-hour emergency contact. When emergency response is requested by the City, the Contractor shall acknowledge the request within one (1) hour and, when directed by the City, mobilize within four (4) hours unless another response time is established in the Work Authorization.
**Multiple Vendor Awards:** Award of this contract does not guarantee any minimum amount of work. The City may assign Work Authorizations among awarded contractors based on availability, response time, price, qualifications, past performance, workload, specialized capability, and the needs of the project.
No work shall begin and no cost shall be incurred without a written Work Authorization or Notice to Proceed issued by an authorized City representative, except where emergency work is specifically authorized by the City.
All work shall be guaranteed for a period of not less than one full year unless stated otherwise in the specifications.
Unit and Lump Sum prices quoted in Exhibit A.1 Schedule of Unit & Lump Sum Prices shall be firmly all-inclusive prices.
**Insurance and bonding (Appendix B):** No work under the agreement may be commenced until all insurance and bonding requirements contained in this Appendix B, or required by applicable law, have been complied with. All insurance and bonds required by this Appendix B must be maintained during the entire term of the agreement, including any renewal or extension terms, and until all work has been completed to the satisfaction of City. Companies providing insurance or bonds must have a Best's rating not less than A-, and a Best's Financial Size Category not less than Class VII. All bid, performance and payment bonds must be underwritten by a U.S. Treasury Circular 570 listed company.