Hawaii Department of Health (Hawaii) posted this RFP on Nov 12, 2026. Responses are due Jan 6, 2027. Category: Construction - Building. Questions are due 2026-12-09. Solicitation number P27000763.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Kama'ule'ule Building, a three-story structure spanning 134,570 square feet, was constructed in 1992. Located on Waimano Ridge, the building has served as a hub for laboratory testing, playing a pivotal role in supporting environmental and public health programs statewide.
This Request for Proposal (RFP) focuses on addressing specific infrastructure needs within the Kama'ule'ule Building. The primary objective is the removal and replacement of HVAC ductwork insulation and the sealing of air leaks within specified areas. These measures are necessary to prevent condensation buildup and leakage, thereby ensuring the continued functionality of essential testing equipment and laboratory spaces.
Please be aware that the contract award is subject to the availability of funds.
Contractor shall provide all labor, supervision, equipment, materials, tools, supplies and all incidentals necessary for removal and replacement of ductwork insulation, sealing, repair or replace flex duct and branch insulation, and to insulate the tops of supply registeres as identified in the as-built drawings, Exhibit 3.
New insulation material and insulated flex duct shall match the existing R= 6.0 minimum installed value, and match or exceed original materials used to seal ductwork.
Due to limitations in funding availability the scope of work will be divided into Two (2)Phases per below and also reference the as-built drawings, Exhibit 3. [...]
Contractor shall be responsible for removing ceiling tiles, ceiling grids and gypsum board (in areas with solid ceilings) in order to create sufficient access to properly remove, replace and seal insulation material and ductwork.
Contractor shall be responsible for properly re-installing ceiling tiles and ceiling grid upon completion of work or providing, replacing and installing ceiling with new grid and tiles if original grid and tiles is deemed to be unusable in consultation with approval by the State. [...]
Contractor shall repair and paint any solid ceilings that was opened to access the duct work with materials and color that equals or exceeds the materials removed in consultation with and approval by the State.
Contractor shall be responsible for protecting below ceiling work areas from dust and debris.
HVAC shutdowns shall be scheduled only for Saturday, Sunday, or a State holiday. [...] State must be allowed to restart HVAC/air handler by 8:00a.m. Hawaii Standard Time (HST) on the next regular State workday.
Prep work, removal, installation, and clean up in a designated space shall be completed in a consecutive 6 (six) calendar day period and the Contractor shall schedule work times in consultation with the State.
Contractor shall be responsible for ensuring proper signage and barriers are in place to prevent accidental entry and injury by building occupants while work is being conducted
**Submission method:** Offers shall be submitted to the Hawaii State e-Procurement (HIePRO) at https://hiepro.ehawaii.gov, due **January 6, 2027, 2:00 PM HST**.
The contract shall be for a period of three (3) months and is intended to begin approximately on June 15, 2027 and end on September 14, 2027. [...] the contract may be extended without re-solicitation, upon mutual agreement in writing between the State and the CONTRACTOR, prior to the expiration date, for not more than ONE (1) additional TWELVE (12) month period, or parts thereof.
All interested parties are invited to attend a State-conducted voluntary pre-proposal conference meeting and on-site inspection of the work area and equipment on December 3, 2026 at 10:00 a.m. The pre-proposal conference and on-site inspection is not mandatory; however, Offerors are strongly encouraged to attend to gain a better understanding of the requirements of this RFP.
Contractor shall have a valid contractor's license to conduct business in Hawaii and shall provide proof of qualification to perform the specified work with a minimum of five (5) years -experience.
Minimum three (3) year warranty on parts from date of final completion and acceptance to the original user of the materials if it should prove defective. [...] Contractor shall provide a written warranty that the completed project is free from any workmanship defects for a period of one (1) year from the date of the whole project's final acceptance.
The price shall be the all-inclusive cost, including all applicable taxes, and cost of insurance to the State.