Illinois Department of Natural Resources (Illinois) posted this IFB on Nov 23, 2026. Responses are due Dec 15, 2026. Category: Construction - Heavy & Civil. Solicitation number 26-422DNR-MINES-B-54946.
The Kickapoo Valley Coal Company Dam Reclamation project includes the modification of the existing surface mine pit impoundment dam which contains the main entrance road to the landfills.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Kickapoo Valley Coal Company Dam Reclamation project includes the modification of the existing surface mine pit impoundment dam which contains the main entrance road to the landfills.
The following information will become the contract between the awarded vendor and the Illinois Department of Natural Resources.
Project includes clearing and earthwork to reclaim an existing dam on the project site. Other work associated with the project will include construction of a principal spillway, emergency spillway and riprap lined outfall chute, a haul road dam, replacement of the existing roadway on the crest of the dam and establishing a wetland within the south half of the existing pond. The wetland will also include a walking trail around the perimeter.
This dam, known as the Landfill Entrance Dam, is provisionally classified as an Intermediate Size, Class Il dam. The Landfill Entrance Dam will have a height of 67 feet, with a top elevation of 631.0 ft. MSL. The top width of the embankment will be 35 ft. with slopes set at 4H:1V. The total length of dam will be 660 ft. The reservoir will have a maximum impounding capacity of approximately 419 acre-ft. The spillway system will consist of a Concrete pipe principal spillway and a rip rap lined emergency spillway swale on the right abutment. The normal pool elevation will be 615.0 ft. MSL.
A new dam will be added upstream of the Landfill Entrance Dam. The new dam will be known as the Haul Road Dam. It will be 36 feet in height and 520 feet long. The top width will be 60 feet with embankment slopes of 4H:1V. It will have a maximum impoundment capacity of 185 acre-ft. The dam will have a spillway system consisting of a single pipe conduit.
Mitigation for the original 1.62 acres of emergent wetland impacts will be relocated to an onsite location and include conversion of a deep-water portion of the surface mine pit impoundment to a wetland complex of approximately 15.5 acres and will include an upland buffer.
Vendors must be prequalified with the Illinois Department of Transportation in order to bid on this project. [...] The vendor awarded the contract must complete **51%** of the work.
Instructions and requirements to submit a bid response are found in the attachment titled *Invitation for Bid Vendor Instructions and Requirements*.
It shall be the responsibility of the Contractor to visit the reclamation site in order to become fully acquainted with all the details pertaining to the project.
Work on the project shall commence within 10 calendar days of execution of the contract. The Contractor shall contact the IDNR within the 10-day period to schedule a preconstruction conference prior to the beginning of actual construction operations.
The IDNR may assess liquidated damages until work is completed, as provided in Article 108.09 of the Standard Specifications.
Insurance required: workers compensation and employers liability, commercial general liability, owners and contractor's protective liability, commercial automobile liability, and umbrella liability.
Subscribe to get these 15 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.