Iowa State University (Iowa) posted this RFQ on Nov 12, 2026. Responses are due Nov 30, 2026. Category: Laboratory & Scientific. Questions are due 2026-11-24 11:00. Solicitation number RFQ-1001542.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
On behalf of the Aerospace Engineering Department, Iowa State University is soliciting bids for a dual-cavity pulsed Nd:YAG laser with an articulating beam delivery arm, mounting hardware, and adjustable light sheet optics for particle image velocimetry (PIV). The system will illuminate tracer particles for paired-image measurements of fluid velocity fields in laboratory flow experiments. All components must be supplied as a compatible assembly suitable for PIV measurements and plasma diagnostics.
Item A — Dual-cavity pulsed Nd:YAG laser, quantity 1
Item B — Articulating beam delivery arm, quantity 1
Item C — Laser mounting base plate, quantity 1
Item D — Adjustable light sheet optics, quantity 1
The supplier shall ensure that all components proposed under Items A through D are mechanically, optically, and electrically compatible and function together as a complete PIV laser and light sheet delivery system. The supplier shall identify any additional components, adapters, mounting hardware, accessories, or modifications necessary for proper system operation and include them in the proposal pricing.
**Submission:** Responses are submitted through the e-procurement system (ISUBid) by **11/30/2026 10:00 AM (CT)**. An *itemized quotation*, *technical literature* for each item, and a *warranty* document are **required** attachments.
**Evaluation:** The evaluation of this RFP/RFQ may be based upon, but not limited to:
Delivery is strongly preferred to be within eight weeks after receipt of the purchase order. The delivery, installation, and training timeline is a critical evaluation factor.
Optional equipment, accessories, and services may be included but must be itemized and clearly identified as OPTIONAL. The references provided MUST be references from outside of your company, and 3 are required.
Subscribe to get these 8 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.