RFP Northeast Substation Reliability Improvements

Active OTTAWAKS-47 RFPArchitecture & EngineeringCity of Ottawa
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Ottawa (Kansas) posted this RFP on Nov 11, 2026. Responses are due Dec 10, 2026. Category: Architecture & Engineering. Questions are due 2026-12-03. Solicitation number OTTAWAKS-47.

Solicitation details

General information

Solicitation number
OTTAWAKS-47
Notice type
RFP
Place of performance
Kansas
Questions due
2026-12-03

Agency and category

Agency
City of Ottawa
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Ottawa, Kansas seeks sealed proposals from qualified electric utility engineering firms to advance previously identified reliability deficiencies at the City's Northeast (NE) Substation into defined infrastructure improvements, preliminary engineering, phased implementation recommendations, and defensible project cost estimates.

The primary objective of this RFP is to move the City from problem identification to project definition. The selected consultant will develop a recommended physical and operational solution, advance that solution to a preliminary design level suitable for capital authorization and budgeting, provide an Engineer's Opinion of Probable Construction Cost, and establish a practical implementation sequence.

Scope

The selected consultant shall furnish all professional engineering services, project management, field review, technical coordination, system analysis, preliminary design, estimating, meetings, documentation, and incidentals necessary to complete the following scope.

Project Objectives

  • Define the recommended improvements necessary to provide true N-1 transformer-level redundancy at the NE Substation, including a sectionalized low-side bus and bus-tie capability that allows either transformer to support the City's defined NE planning load when the other transformer is unavailable for a forced outage, inspection, testing, maintenance, or repair.
  • Develop a practical strategy to address the single 161-kV transmission-source vulnerability, including a second independent supply where feasible or another engineered solution that provides suitably independent supply redundancy.
  • Define the 12.47-kV feeder, switching, protection, and distribution improvements needed to support reliability, emergency transfer capability, and future industrial growth.
  • Advance the recommended improvements to approximately a 30-percent preliminary design level sufficient to establish scope, major equipment requirements, constructability, phasing, and capital cost.
  • Provide an Engineer's Opinion of Probable Construction Cost for the recommended overall project and for logical implementation phases, including appropriate assumptions, contingencies, escalation considerations, and major exclusions.
  • Identify major equipment lead times, permitting and coordination requirements, outage needs, and a realistic design/procurement/construction schedule.
  • Provide a clear path for the City to proceed into final design and construction without repeating the planning work already completed.

Required Deliverables

  • Project work plan, data request, and schedule following the kickoff meeting.
  • *Basis of Design* memorandum documenting the confirmed design criteria and any material assumptions or data limitations. [...]
  • Approximately 30-percent preliminary design package, including one-line diagrams, conceptual site/general arrangement drawings, major equipment list, design criteria, and other exhibits needed to define the project. [...]
  • Engineer's Opinion of Probable Construction Cost for the full recommended project and each proposed implementation phase, with assumptions, contingencies, escalation basis, and exclusions clearly stated.
  • Phased implementation plan identifying what should be constructed first, subsequent phases, expected reliability benefit of each phase, and any remaining single points of failure after each phase. [...]
  • Final preliminary engineering report and electronic copies of drawings, calculations, estimates, system-model outputs, figures, and other project files developed specifically for the City.

Additional information

Submission

Proposals must be received by the City Clerk no later than **Thursday, December 10 at 1:15 p.m. Central Time**. Hard-copy submissions: One (1) hard copy, must be delivered in a sealed envelope clearly marked "NE Substation Reliability Improvements Proposal." Electronic submissions: One (1) electronic copy in PDF format may be submitted to cityclerk@ottawaks.gov. The email subject line must identify the proposal. Proposals received after the deadline will not be considered.

Evaluation

Proposals will be evaluated for the overall offer most advantageous to the City. The anticipated evaluation weighting is:

  • Relevant substation, transmission, and distribution project experience - 25%
  • Technical approach and demonstrated understanding of the City's identified reliability problems and desired project-development outcome - 25%
  • Qualifications and availability of the proposed project team - 15%
  • Project schedule, coordination plan, and ability to advance the work efficiently - 10%
  • Quality and relevance of comparable project references - 10%
  • Phase 1 fee, clarity of fee assumptions, and overall value to the City - 15%

Insurance and Agreement

The selected consultant shall enter into the City's applicable professional services agreement before commencing work and shall maintain insurance coverage acceptable to the City. No services shall begin until the agreement and required insurance documentation have been accepted by the City.