Letcher County - Stream Restoration Boulder Installation (Hourly Equipment Rental with Skilled Operator)

Active Stream - 1 IFBConstruction - Heavy & CivilLetcher County
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Letcher County (Kentucky) posted this IFB on Nov 25, 2026. Responses are due Dec 10, 2026. Category: Construction - Heavy & Civil. Solicitation number Stream - 1.

Solicitation details

General information

Solicitation number
Stream - 1
Notice type
IFB
Place of performance
Kentucky

Agency and category

Agency
Letcher County
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Letcher County Fiscal Court is soliciting bids from experienced contractors to provide stream restoration services by installing boulders in J-hook and cross-vane formations.

This Request for Bids (RFB) is for an hourly rate rental of equipment, delivered, with a skilled operator, including mobilization and demobilization, for the installation of large boulders (over 1 ton) at streambank restoration sites throughout Letcher County.

Any contractor with overdue work for the county is ineligible for additional work from the county until overdue projects are completed.

Scope

Project Requirements

  • Installation of large boulders (over 1 ton each) in J-hook and cross-vane formations, and stacking of boulders in waterways, to restore streambanks, redirect flow away from banks, and control grade at sites designated by the County.
  • **Required equipment:** A 170 excavator or greater with a hydraulic thumb and A track skid steer with a 1-ton bucket and forks.
  • Equipment must be owned by the bidder and insured. The contractor delivers the equipment to each work site (mobilization) and removes it when the work is complete (demobilization).
  • Work is paid at the hourly rates bid, for the bidder's equipment with its skilled operator, plus mobilization/demobilization per site. Site layout and boulder placement will be directed and inspected by the County.
  • Boulders will be provided by the County. Boulders will be approximately 24 to 26 IN Diameter and weigh 1,000 pounds or more.
  • Work sites: streambank restoration sites throughout Letcher County, including but not limited to Eolia Park (Franks Creek).
  • Use care to not destroy pavement. All in-stream work must follow the KDOW and USACE permit conditions for each site.

Operator Requirements

  • Bidders must list the operator name and provide the operator's resume.
  • The operator listed must be the one doing the work. No operator substitutions will be allowed.
  • The operator must have experience in the industry, including: installing boulders over 1 ton; stacking boulders in waterways; and building cross vanes and J-hooks.
  • Debris removal work does NOT count as stream restoration/boulder experience.

Pricing

Hourly rates shall be all-inclusive: equipment rental, delivery, skilled operator labor, fuel, maintenance, insurance, and all other costs, and shall not be increased or changed for any reason other than changes requested or approved by the County.

Mobilization/demobilization is bid as its own line item (per site mobilization). Hours and mobilizations are estimates only and are not guaranteed.

Additional information

All bids must be submitted by **2:00 PM ET on December 10, 2026** through the **DFS Procurement Services Portal** at dfs.bonfirehub.com. The full RFB can also be reviewed at erassist.com/work.

Bids will be opened publicly at 3:00 PM ET in the Judge Executive's Office. Award is scheduled to occur at the monthly Letcher County Fiscal Court Meeting on December 21, 2026 at 10:00 AM EST. [...] All prices submitted with the bid shall remain in effect for **one hundred eighty (180) days**.

Bidders **must** provide insurance policies in the portal showing proof of general and professional liability coverage upon submission. [...] Successful bidders must provide a Certificate of Insurance showing proof of liability coverage for a minimum of **$1,000,000** and Workers Compensation.

Submittal Checklist

1. Operator name and operator resume.
2. Photos of the equipment to be used.
3. Proof of ownership of the equipment.
4. Proof the equipment is insured.
5. Copy of Insurance (General Liability, Commercial Auto, and Workers' Compensation).
6. KDOW (Kentucky Division of Water) permits for previous stream restoration/boulder work done by the bidder. Debris removal permits will NOT be accepted.
7. Copy of Drug Free Workplace Policy.
8. SAM.gov printout showing active registration and three references.

Documents

1 file

Subscribe to get this document.

  • Several Disasters Letcher County Stream Restoration Boulder Installation (Hourly Equipment Rental w Operator) RFB due 12.10.26.pdf
    Download

Similar open bids

In Kentucky