Carlson Field Athletic Complex: Construction of new Pickleball Courts (REBID)

Active CFPC-26-2 IFBConstruction - Heavy & CivilTown of Hingham
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Town of Hingham (Massachusetts) posted this IFB on Nov 25, 2026. Responses are due Dec 16, 2026. Category: Construction - Heavy & Civil. Solicitation number CFPC-26-2.

Solicitation details

General information

Solicitation number
CFPC-26-2
Notice type
IFB
Place of performance
Massachusetts

Agency and category

Agency
Town of Hingham
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Town of Hingham, MA ("Town") is accepting **sealed bids** for the construction of eight (8) new pickleball courts located at the Carlson Field Athletic Complex at Bare Cove Park Drive.

The general work will include but is not limited to the removal of existing trees and shrubs, including stump and root removal, re-grading the site and the installation of the eight (8) new pickleball courts, including posts, nets, walkways, benches, shade shelters, fencing, sound attenuation, new asphalt parking lot and ADA pathways.

Estimated Pickleball Court Construction Cost, **$1,300,000**.

Scope

The general work will include but is not limited to the removal of existing trees and shrubs, including stump and root removal, re-grading the site and the installation of the eight (8) new pickleball courts, including posts, nets, walkways, benches, shade shelters, fencing, sound attenuation, new asphalt parking lot and ADA pathways.

The Contractor will be responsible for installing and/or maintaining the construction fence and erosion control where needed prior to demolition and site prep and throughout the project. Erosion control and construction fence will be in place from the building demolition contractor, coordinate with contractor to either take over the rental of the construction fence or provide new construction fence as required. Erosion control shall remain in place, be repaired or replaced if needed and maintained throughout the project duration.

The Contractor is **required** to coordinate with the Town and the demolition contractor prior to construction. The demolition contract of Building 12 has been officially awarded by the Town of Hingham Select Board to Pasquazzi Bros, Inc., on September 29, 2026.

Similar open bids

In Massachusetts

More from Town of Hingham

Open bids