Military Division (Massachusetts) posted this ITB on Nov 11, 2026. Responses are due Nov 30, 2026. Category: Construction - Building. Solicitation number BD-27-1069-MILDV-10000-135319.
HVAC Upgrade - Mini Split Installation Westfield AASF #2 (MA National Guard)
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Awarding Authority seeks a Limited User Contract to award one (1) contractor to perform an HVAC upgrade and all subsequent items in the included specifications for project FMO26281 HVAC Upgrade – Mini Split Installation Westfield AASF #2 (MA National Guard) 175 Falcon Drive Westfield, MA 01085
Estimated Project Cost: $55,000.00
The Engine Repair Shop and the Sheet Metal Shop are lacking heat and A/C, while the Supply and GSE Rooms are lacking A/C. These shops currently lack adequate climate controls which poses significant risk to the operation and preservation of critical equipment and the health and safety of site personnel.
Proposal will include all labor, tools, and equipment necessary to complete the following Scope of Work:
Installation of two (2) 5-Ton outdoor Compressor/Condenser Units supporting multiple (8) indoor air handlers. One Unit will support both heat and A/C while the other will support A/C only.
Awarded contractor shall conduct a thorough site assessment to understand the existing conditions and requirements for the installation of two (2) 5-Ton outdoor Compressor/Condenser Units supporting multiple (8) indoor air handlers. All supporting Refrigerant Lines, Communication Wiring (electrical), Condensate Drains and Power Supplies are to be included in the assessment. All work must follow OSHA and MA State construction and safety regulations. Room sizes and requirement details as follows:
All rooms have 17’ to 20’ sloped/open ceilings.
Contractor will ensure that the units are of a reputable brand, utilizing R-454B refrigerant and are compliant with all State and Federal Environmental regulations. Contractor will ensure safe and secure physical (outdoor pad) mounting of each unit along with the installation of protective bollards. Contractor will ensure weather-tight seals preventing air and water leakage. Contractor will ensure proper condensate drainage for each unit to eliminate water damage. Contractor will ensure proper and safe electrical connections for each unit that meet all City, County and State codes. Contractor will perform thorough testing of each unit to confirm proper operation and heating/cooling performance including; heating/cooling output verification and refrigerant charge validation.
Contractor will restore any disturbed surfaces to their pre-installation condition (walls, ceilings, insulation etc). Contractor will ensure that all debris, packaging and any other associated items are properly disposed of in accordance with State and Federal regulations. Contractor will provide all detailed installation documents, operations manuals, warranty information and preventative maintenance guidelines.
Warranty requirements must include at least five (5) years for the Compressors and all other sealed system parts, and one (1) year for all other parts and labor. Warranty period will commence upon final CFMO acceptance of successful installation, testing and start up.
**Bid Submission:** Participating vendors shall submit a completed General Bid Form with a lump sum cost for the project scope of work. A 5% bid bond must accompany a completed general bid form. Only electronic quotes submitted via COMMBUYS will be accepted in response to this ITB. Responses must be sent via the “Create Quote” functionality in COMMBUYS. Additional statutory forms to be included are the Commonwealth Authorized Signatory and Non- Collusion Forms.
A lump sum bid will be evaluated using M.G.L. c. 149 by the Awarding Authority.
**Wages:** Prevailing wages will be required for this project. Certified payroll is required prior to progress or final payment.
**Insurance:** The awarded contractor will be responsible for producing a certificate of liability insurance, naming the MA National Guard as additionally insured. A Payment Bond to the amount of 50% of the project value will also be required should the project value exceed $25,000. Payment Bonds and Performance Bonds in the amount of 100% of the project cost will be required for bids over $150K.
**Site Visit:** **Mandatory** site visit has been scheduled for Wednesday, November 18 at 11:00AM. A Real ID or US Passport will be required in order to enter this site.
Estimated Contract Start Date : December 16
Subscribe to get these 4 documents.