Cape Cod Community College (Massachusetts) posted this IFB on Nov 16, 2026. Responses are due Dec 7, 2026. Category: Construction - Building. Questions are due 2026-11-25 11:00. Solicitation number CAPECOD-BFD345AD.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Cape Cod Community College ("CCCC" or the "College"), an agency of the Commonwealth of Massachusetts, invites qualified and properly licensed contractors to submit proposals for the replacement of an existing Duplex Sewerage Ejector for the Tilden Arts Building at the main West Barnstable campus.
This bid solicitation is directed at licensed contractors and service providers who are interested in undertaking the replacement of the existing duplex sewerage ejector pump system within our commercial property. The successful contractor will be responsible for the complete removal of the outdated system, installation of a new, efficient, and compliant duplex sewerage ejector pump system and all electrical wiring to both pumps and motor controls. Ensure that all work is completed in accordance with local building codes and regulations.
Project Objectives
A duplex VSA-6H suspended wet-pit sewage pump unit as manufactured by Federal Pump Corp or simulator. Each pump shall be rated 325 G.P.M. at 40 feet Total Dynamic Head, shall have a 4" inch discharge and be built for a pit or basin 10 Feet deep. [...] Motors shall be 2 HP, 3 phase, 480 volts, 1750 R.P.M. open, drip-proof ball bearing type. Furnish a pedestal mounted alternating float switch to alternate the operation of the pumps and provide simultaneous operation when required. Furnish a pedestal mounted auxiliary float switch to turn on both pumps if the alternating float switch is inoperative. [...] Supply an extra set of dry electrical contacts for future external alarm capability.
General Services
The contractor is responsible for the safe disconnect, demolition, and disposal of all electrical, plumbing, and other structures to be removed for the installation of the new system. The contractor is required to clean up their worksites and disposal of work-related trash at the end of their shift each day. Trash can be disposed of onsite at the facilities building dumpster. The contractor shall furnish all labor, supervision, tools, diagnostic equipment, transportation, materials, consumables, and incidental services necessary to work in a professional manner. Services shall include inspection, testing, adjustment, cleaning, lubrication, repair, replacement, troubleshooting, commissioning, and reporting for covered equipment and systems.
Confined Space Requirements
The contractor is required to have all employees that will be performing work at Cape Cod Community College to be confined space certified. Contractor's confined space plan shall comply with OSHA 29 CFR 1910.146.
Submission method
Bids must be submitted on the forms supplied by the College for receipt NO LATER THAN Monday, December 7th, 2026, by 11:00 am. The forms must be emailed to procurement@capecod.edu. All the completed required forms must be in a PDF format and noting "IFB 27-05 Replacement of Duplex Sewerage Ejector." in the email's subject line. No late or faxed submissions will be accepted. No incomplete proposals will be considered.
Required Forms
Award
The College shall award this contract to the responsive and responsible respondent offering the lowest price for the products requested in accordance with the specifications of this IFB.
Prices quoted must be available for acceptance for at least ninety (90) days after the proposal's opening date unless otherwise noted in your proposal.
Insurance
The contractor shall maintain, at its own expense, insurance appropriate to the work, including commercial general liability, automobile liability, workers' compensation, employer's liability, and professional or pollution liability when applicable.
Contract term
The contract's anticipated start date is December 26, 2026. Contractor is required to be onsite.
This contract is required to be paid at the prevailing rate.
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.