City of Detroit (Michigan) posted this RFP on Nov 12, 2026. Responses are due Dec 10, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-07. Solicitation number 552409.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Detroit Office of Contracting and Procurement (OCP) on behalf of the Human, Homeless, and Family Services (Bridging Neighborhoods) requests proposals from qualified Respondents to render certain technical or professional services ("Services") as set forth in this RFP to provide property assessment, engineering design, permitting support, and construction services for the evaluation, design, and construction, reconstruction, and/or repair of privately owned residential seawalls (bulkheads) serving properties in the Jefferson-Chalmers neighborhood, along canals connected to the Detroit River in Detroit, Michigan.
The Contractor's scope of work is organized into four service categories. The City will issue specific task orders (see Section 3.6 in Scope of Work) identifying which services apply to each property. The Contractor is expected to coordinate the design and construction drawings with the City to help ensure that the selected infrastructure is durable and meets applicable requirements.
The project will repair, replace, and/or install seawalls for privately owned residential parcels along canals within the Jefferson-Chalmers neighborhood, including the Fox Creek, Phillip Street, and Lakewood Canals. Parcel addresses will be located on one or more of the following streets: Ashland, Klenk, Scripps, Harbor Island, Alter, Lakewood, and Manistique. The project's intent is to assist with flood mitigation by providing seawalls, especially for low-income owner-occupants.
The subject properties lie within a FEMA-designated flood hazard area. As a result, all new seawalls, seawall extensions, seawall repairs, and full replacements performed under this RFP shall be designed to a minimum top-of-wall elevation of **580.0 feet NAVD88** (see Section 3.2). This elevation requirement applies uniformly across the property portfolio and is not subject to proposer discretion; it reflects the City's flood mitigation objectives for the neighborhood.
The condition of selected parcels may vary — from no seawall, to an existing seawall in need of replacement, to an existing seawall in need of repair, to an existing seawall in good condition that is low and in need of greater height.
Community engagement will take place before the contract is awarded and will not be the responsibility of the contractor. Construction is expected to be completed in 2027.
Please See *Attachment G* (Scope of Work) for detailed description.
**Submission method:** All proposals must be submitted through Bonfire/EUNA at detroit.bonfirehub.com. Faxed or mailed proposals will not be accepted. Late and/or emailed proposals will not be accepted.
If a contract is awarded as a result of this RFP, it will be a City of Detroit Professional Services Contract (*Attachment E*). The term of the contract will be for Two (2) years. The City anticipates one or multiple awards as a result of the RFP.
Proposals will only be accepted from those firms demonstrating a minimum of five (5) years of experience providing the services requested in this RFP for projects of similar scope and size.
Technical Proposals will be evaluated before Cost Proposals are reviewed.
| Proposal Evaluation Criteria | Possible Points |
| --- | --- |
| 1. Firm qualifications and relevant Detroit River / canal seawall experience, including references and past performance | 30 |
| 2. Qualifications of key personnel, including PE licensure | 15 |
| 3. Technical approach and methodology | 15 |
| 4. Proposed schedule and demonstrated capacity | 15 |
| 5. Pricing | 25 |
| Total Points Possible | 100 |
Detroit Equalization Credits shall be applied after the technical and price evaluation.
Terms are standard NET 30 Days, unless otherwise negotiated, and start from the invoice receipt date.