City of Omaha (Nebraska) posted this IFB on Nov 18, 2026. Responses are due Dec 16, 2026. Category: Construction - Building. Solicitation number CI-2026-0162.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This project includes the removal of existing ballasted roofing, replacement of damaged insulation, installation of ½" protection board over insulation, and installation of a new Ballasted Roofing Membrane System at the Missouri River Water Resource Recovery Facility (5600 S 10th St, Omaha, NE 68107). The scope of work encompasses the entirety of both the Administration Building and Sludge Dewatering Building roofs.
Bid shall be on a firm Lump Sum Bid - AlternateType: None basis for respective bid items identified in the Bid Form.
This project includes the removal of existing ballasted roofing, replacement of damaged insulation, installation of ½" protection board over insulation, and installation of a new Ballasted Roofing Membrane System at the Missouri River Water Resource Recovery Facility (5600 S 10th St, Omaha, NE 68107). The scope of work encompasses the entirety of both the Administration Building and Sludge Dewatering Building roofs.
Contractor shall perform a minimum of 30 percent of the work without subcontracting. Purchasing of materials shall not qualify as self-performing the Work.
Online, electronic bids will be received on the Douglas County Purchasing website at https://douglascountypurchasing.ionwave.net/Login.aspx, until 11:00 A.M. local time, and shortly thereafter the bids will be opened publicly and read out loud.
A Bid must be accompanied by Bid security made payable to Owner in an amount of **5 percent** of Bidder's maximum Bid price and in the form of a certified check, an official bank check, cashier's check drawn on a national bank or a bank chartered under the laws of the State of Nebraska, payable to the City or a duly executed Bid bond.
The successful BIDDER will be required to furnish Performance and Payment Bonds as described in Section 00 72 13 - General Conditions.
Bidder must include with the Bid a copy of the City of Omaha General Contractor License of the class required in Specification Section 00 41 13 - Bid Form, Article 4, Bidder's Certifications.
Bidders must complete and include with the Bid a Certificate of Compliance Form which is included as Exhibit "B" of the Bid Form.
Bidders must complete and include with the Bid a Responsible Contractor Compliance Form (RC-1) which is included as Exhibit "C" of the Bid Form.
Bidders must complete and include with the Bid the Participation Disclosure Form which is included as Exhibit "A" of the Bid Form.
Site visit may be scheduled by contacting: Eric Goodbarn, 402-444-3910
If the Contract is to be awarded, it will be awarded to lowest Bidder whose evaluation by Owner indicates to Owner that the award will be in the best interests of the Project.