City of Lincoln (Nebraska) posted this IFB on Nov 13, 2026. Responses are due Dec 2, 2026. Category: Construction - Heavy & Civil. Solicitation number 26-219.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Water Main Replacement 35th & Calvert Area Project No. 700986 for the City of Lincoln, Nebraska (Lincoln Transportation and Utilities). The plans cover water main replacement on Calvert St., S 35th St., Merritt Dr., Hillside Cir., Hillside St., S 38th St. and Woodbine Ave., and a water service at 3727 Sheridan Blvd.
Summary of Quantities (from the plans)
The contractor shall field verify the location and elevation of all existing utilities, through the use of potholing, excavation, or other means, prior to construction on this project.
The contractor shall coordinate with LES & Windstream, at least 14 days in advance of work being performed near LES/Windstream facilities, to brace poles as necessary during construction.
A performance and payment bond in the full amount of the contract shall be required for all construction contracts. These bonds shall remain in effect during the guarantee period as stated in the specifications. Once the project is completed, the Contractor may submit a maintenance bond in place of the performance bond.
The Contract Documents consist of the following: Contract Terms, Accepted Proposal, Addendums, Special Provisions, Specifications, Plans and Profile Detail Sheets, Instructions to Bidders, Insurance Requirements, Employee Classification Act Requirements, *Employee Classification Act Affidavit*, Construction Bonds, *City of Lincoln Standard Specifications for Municipal Construction (2023 Edition)* and *Lincoln Standard Plans (2023 Edition)*.
The City has determined the Contractor to be the lowest responsible bidder for the Work.