Nebraska Public Power District (Nebraska) posted this RFQ on Nov 25, 2026. Responses are due Dec 11, 2026. Category: Utilities & Energy. Solicitation number ProcurewareMultiWebsites-b74a1939.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Nebraska Public Power District (DISTRICT) is soliciting competitive bids from qualified Manufacturers capable of delivering consistent, high-quality substation control panels for the DISTRICT Princeton Road project.
Control Panels (Princeton Road 115kV Substation)
The Manufacturer shall provide all labor, material, and equipment for the following panels:
The Princton Road substation panels shall be designed, manufactured and provided in accordance with the DISTRICT Technical Specifications, materials lists, panel layout, device and nameplate data included with this request.
Manufacturer shall review DISTRICT Technical Specifications and clearly identify any areas they are unable to meet as specified. Manufacturer shall also provide suggestions for those opportunities that could reduce lead-times or otherwise enhance project delivery while maintaining DISTRICT operational requirements.
Delivery
Delivery shall be to the DISTRICT York Operations Center, York, Nebraska unless otherwise stated on the procurement document. [...] The Princeton Road substation panels shall be delivered FOB Destination, to the York Operations Center, 907 West 25th Street, York NE 68467, on or before **October 22, 2027**. Panels shall be shipped flatbed haul, plywood crated with lifting eyes.
All deliveries shall be freight prepaid and invoiced, with title and risk for each item transferring once delivered, unloaded and accepted at destination.
Copies of Manufacturer electronic bid are to be in the possession of the DISTRICT for review and evaluation no later than **close of business December 11, 2026**. Bids shall contain all information requested above and **emailed** to Kyle Sundberg at kjsundb@nppd.com. [...] The subject line of the email shall include the name of the Manufacturer and this RFQ Number [...]. The DISTRICT has a ten (10) megabyte limit on emails.
Manufacturer shall provide a firm, fixed-price Bid itemized for all materials, equipment, and services specified herein, together with a separate estimated freight cost. [...] Bid shall identify any items subject to tariffs and include the estimated tariff cost for each applicable item [...]
If the Bidder has no prior experience with the DISTRICT, provide references for three utilities the Bidder has provided similar substation control panels within the past three years.
Bid price and all information provided shall be valid for a period of **ninety (90) calendar days** from the bid submission date.
The acceptance of, or any exceptions to, these terms and conditions shall be clearly stated and will be taken into consideration during bid evaluation.
Seller warrants [...] to remedy all defects [...] within sixty (60) months from date of successful operation, or sixty-six (66) months from date of delivery, whichever comes first [...]