Nevada State University (Nevada) posted this RFQu on Nov 9, 2026. Responses are due Jan 12, 2027. Category: Architecture & Engineering. Questions are due 2026-11-24 15:00. Solicitation number 919-HE.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Nevada State University (“NSU”) is seeking a qualified professional consulting firm to develop a comprehensive Infrastructure Inventory and Atlas for its approximately 512-acre campus in Henderson, Nevada. Services include reviewing existing records, inventorying and mapping campus utilities and site infrastructure, evaluating utility capacities and constraints, conducting land and topographic surveys, and developing coordinated CAD and GIS mapping. The final Atlas shall be provided in printed, searchable PDF, and editable digital formats to support future campus development, capital projects, operations, and deferred maintenance planning.
Services include reviewing existing records, inventorying and mapping campus utilities and site infrastructure, evaluating utility capacities and constraints, conducting land and topographic surveys, and developing coordinated CAD and GIS mapping. [...] Mapping extends to building service connections; interior distribution systems are excluded unless specifically identified. Identify recommended intrusive investigations not included in base services, their purpose and locations; these require written NSU authorization. Submit proposed field coverage, methods, assumptions, and limitations for NSU review before fieldwork. [...] Incorporate existing boundary records; a new boundary survey is excluded from base services and requires separate authorization. [...] Building-specific hazardous-material surveys, asbestos sampling, and abatement design are outside the base scope unless authorized. Include ten professionally bound hard-copy Atlases, a searchable bookmarked PDF, editable AutoCAD files, a GIS geodatabase with metadata, and supporting source files. Building information verification is limited to site/infrastructure mapping; interior measurement and floor-plan verification require separate authorization.
Submission
Statements of Qualifications must be submitted through the NGEM, Nevada Government eMarketplace at www.ngemnv.com. Proposals must be submitted electronically no later than the Opening Date, no hard copies will be accepted. The Proposal submitted should not exceed one hundred (100) pages.
Evaluation
Proposals will be evaluated according to the evaluation criteria stated below:
| Weighted Evaluation Criteria | Possible Points |
| --- | --- |
| Cover Letter and Executive Summary | Required |
| Firm qualifications and organization | 10 |
| Project team and experience | 20 |
| Subconsultants | 10 |
| Relevant project experience | 20 |
| Project understanding and technical approach | 25 |
| Project schedule | 5 |
| Quality assurance / Quality control | 5 |
| References | 5 |
| Required forms, licenses, and additional information | Required |
| Total Possible Points | 100 |
Insurance
The Successful Proposer will be required to submit proof of insurance at the limits identified in the Contract.
Acceptance period
The Proposer agrees to a minimum of one hundred twenty (120) calendar day acceptance period from the Opening Date or conclusion of interview, if applicable.