RFQ for Nevada State University Infrastructure Inventory and Atlas: Utility Mapping, Capacity Analysis, Surveying, and CAD/GIS Services

Active 919-HE RFQuArchitecture & EngineeringNevada State University
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Nevada State University (Nevada) posted this RFQu on Nov 9, 2026. Responses are due Jan 12, 2027. Category: Architecture & Engineering. Questions are due 2026-11-24 15:00. Solicitation number 919-HE.

Solicitation details

General information

Solicitation number
919-HE
Notice type
RFQu
Place of performance
Nevada
Questions due
2026-11-24 15:00

Agency and category

Agency
Nevada State University
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Nevada State University (“NSU”) is seeking a qualified professional consulting firm to develop a comprehensive Infrastructure Inventory and Atlas for its approximately 512-acre campus in Henderson, Nevada. Services include reviewing existing records, inventorying and mapping campus utilities and site infrastructure, evaluating utility capacities and constraints, conducting land and topographic surveys, and developing coordinated CAD and GIS mapping. The final Atlas shall be provided in printed, searchable PDF, and editable digital formats to support future campus development, capital projects, operations, and deferred maintenance planning.

Scope

Services include reviewing existing records, inventorying and mapping campus utilities and site infrastructure, evaluating utility capacities and constraints, conducting land and topographic surveys, and developing coordinated CAD and GIS mapping. [...] Mapping extends to building service connections; interior distribution systems are excluded unless specifically identified. Identify recommended intrusive investigations not included in base services, their purpose and locations; these require written NSU authorization. Submit proposed field coverage, methods, assumptions, and limitations for NSU review before fieldwork. [...] Incorporate existing boundary records; a new boundary survey is excluded from base services and requires separate authorization. [...] Building-specific hazardous-material surveys, asbestos sampling, and abatement design are outside the base scope unless authorized. Include ten professionally bound hard-copy Atlases, a searchable bookmarked PDF, editable AutoCAD files, a GIS geodatabase with metadata, and supporting source files. Building information verification is limited to site/infrastructure mapping; interior measurement and floor-plan verification require separate authorization.

Additional information

Submission

Statements of Qualifications must be submitted through the NGEM, Nevada Government eMarketplace at www.ngemnv.com. Proposals must be submitted electronically no later than the Opening Date, no hard copies will be accepted. The Proposal submitted should not exceed one hundred (100) pages.

Evaluation

Proposals will be evaluated according to the evaluation criteria stated below:

| Weighted Evaluation Criteria | Possible Points |
| --- | --- |
| Cover Letter and Executive Summary | Required |
| Firm qualifications and organization | 10 |
| Project team and experience | 20 |
| Subconsultants | 10 |
| Relevant project experience | 20 |
| Project understanding and technical approach | 25 |
| Project schedule | 5 |
| Quality assurance / Quality control | 5 |
| References | 5 |
| Required forms, licenses, and additional information | Required |
| Total Possible Points | 100 |

Insurance

The Successful Proposer will be required to submit proof of insurance at the limits identified in the Contract.

Acceptance period

The Proposer agrees to a minimum of one hundred twenty (120) calendar day acceptance period from the Opening Date or conclusion of interview, if applicable.

Documents

3 files

Subscribe to get these 3 documents.

  • Exhibit B_NSU Professional Services (DESIGN) Form Contract.pdf
    Download
  • RFQ 919-HE NSU Infrastructure Analysis.pdf
    Download
  • Exhibit A_CAM 2701 NSU TAP - Resilient Campus Expansion_092026 EXB B.pdf
    Download

Similar open bids

In Nevada