UNR - Install ADA Actuator on Exterior Door in V1001 First Floor West Entrance of William J. Raggio Building

Active ITB 9148 ITBConstruction - BuildingUniversity of Nevada, Reno
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

University of Nevada, Reno (Nevada) posted this ITB on Nov 19, 2026. Responses are due Dec 17, 2026. Category: Construction - Building. Solicitation number ITB 9148.

Solicitation details

General information

Solicitation number
ITB 9148
Notice type
ITB
Place of performance
Nevada

Agency and category

Agency
University of Nevada, Reno
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Install ADA Actuator on Exterior Door in V1001, First Floor, West Entrance of William J. Raggio Building

UNR Project #: 26MNC03409

Labor Commissioner #: WA-2027-076

SPWD Project #: 26-B906

Estimated Cost Range: **$21,585 to $100,000**

Scope

Description of Work: Install ADA Actuator on Exterior Door in V1001, First Floor, West Entrance of William J. Raggio Building

Construction to occur between May 17th through June 30th, 2027 only. [...] The project is located at the 1st floor entry and lobby of the William J. Raggio building. Staging: not typically required by contractors on projects this small. If a staging location is requested by the contractor, we can discuss options for staging areas at the time of contract award.

Additional information

BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted **electronically via this website**.

The NGEM system allows for bidders to start and save work/uploads without submitting.

Liquidated Damages: **$200 per day**

**Required Insurance if Awarded:** Commercial General Liability, Business Automobile Liability, Workers' Compensation, and an Installation Floater policy will be required. Please refer to the *TEMPLATE-Owner-Contractor Construction Agreement* for limits and additional information.

Completion of Work: Subject to change by Owner, Work is scheduled to begin on "May 17, 2027" and shall be fully complete by "June 30, 2027."

Similar open bids

In Nevada

More from University of Nevada, Reno

Open bids