What the bid is for
The MARK Project is seeking qualified contractors to estimate renovation and rehabilitation costs for a property located in Grand Gorge, NY participating in the NYS Downtown Revitilization Initiative Small Project Fund Program.
The property is 37163 State Highway 23, Grand Gorge, NY 12434, owned by Ben Buck. The building houses the post office and apartments.
Scope
Roof
- Remove the existing shingles from all roofs on the building down to the plywood. Re-nail the plywood as needed.
- Cover the deck with ice shield as per NYS code and install new drip edge, flash appropriately where needed.
- Install new flashings on all roof protrusions.
- Remove permanently any unused brackets (owner will advise what ones).
- Install new Lifetime Warranty architectural shingles (color - black) and cobra ridge vent on all ridges (Cut a slot in the peak to vent as needed).
Boiler
- Demo the existing boiler and pipe connection to the chimney. Provide and install a new oil fired cast iron hot water heating boiler of equal BTU's and a new pipe connection to the chimney. Use furnace cement to seal the new pipe into the chimney. Complete all hookups and test.
- Repair the masonry and paint the chimney above the roof black (two coats) with a good quality Ben Moore Masonry paint.
- When installing the new boiler, raise it off the floor a minimum of six inches. Modify the plumbing as necessary to accommodate the new location. Replace two of the existing nine circulators, the owner will identify which two need replacement.
Second floor porch on back of building
- Remove the four support posts. Jack the porch as needed to level and straighten with the building. Install new 8x8 PT posts spaced equally. Install new footers as needed. Securely fasten the top and bottom of the posts.
- Install another post against the side of the stairs under the wall that makes the end of the porch in line with the next post. Cut away this section of the wall and some of the roof return. Trim to finish.
- Demo the existing staircase. Build a new code approved PT staircase with three stringers and railing. Use 2x2 spindles, 2x6 top, and sand smooth. Rest the steps on a cement pad.
- Demo the existing door, install a new Therma Tru prehung in kind unit, re use the door knob. Trim both sides, prime and paint.
Doors and side entrance hall floor
- Demo the entry door on the right front corner and the entry door on the right side (approx. middle of the building). Expand both of the door openings to 36" wide doors. Install prehung fiberglass units, prime and paint, re use the door knobs. Build a PT stoop for the side door.
- Demo the floor inside this side entrance door. Install a new vinyl plank floor (color by owner) with base and transition strips in the doorways.
Siding
- The bottom of all the walls 48"+/-, from the windowsills down will be Faux stone panel siding, (vanilla bean color) available at Home Depot. Continue the 2x4 furring strips filled with rock wool up to the first soffit. Cover with Tyvec and side with 3 ft. wide conventional tin (frosted charcoal grey), available at Willow creek metals in Ft. Plane NY.
- All soffits and fascia's to be clad with aluminum (color by owner).
- Install aluminum gable vents on both ends of the building.
Gutters
- Install new seamless gutters .032 Alcoa 6" K style with fascia hangers and downspouts.
- End all downspouts a minimum of six feet from the foundation.
Attic insulation
- Arrange the random boards in the attic to use as walkways instead of removing and discarding them. Roll out on top of the existing insulation a new layer of R30 fiberglass.
Interior hallway
- Install new round handrails where ever there are handrails and as needed by code. Install returns on the new handrails.
- Demo the existing carpet, pad and tack strips. Have a professional carpet layer install new commercial carpet with a felt type pad.
Split Air System
- Provide and install an LG Red minisplit, 18,000 BTU. The condensing unit will be wall mounted, not concrete mounted. A 25 foot line set and molding kit will be needed.
Additional information
**Mandatory** pre-bid walk-through. If unavailable to attend the walk-through, call Fred Beemer @ 845-586-3500 prior to the walk-through and an alternative appointment will be considered.
Bid submissions are due in the MARK Project Office, 43355 State Highway 28, PO Box 516, Arkville, NY 12406. Mailed submissions must be **received** by the due date.
Contractor **must** attach the following items to their bid submission:
- Updated certificate of Workers' Compensation Insurance
- Updated certificate of Liability Insurance
- EPA Certification to work with lead paint (RRP Training)
- Non-collusive bidding form
Only contractors that are EPA-certified may bid on this project. There must be a lead-certified person on the job site at all times or the job will be shut down.
The *General Contractor Bid Summation Form* must be filled out when submitting a bid.
Work may be conducted between the hours of 7:30am and 6:00pm, Monday-Saturday. No work on Sundays. The business will remain open during construction.
MBE Goal: 15.00%. WBE Goal: 15.00%.