Wake County Public School System (North Carolina) posted this RFP on Nov 23, 2026. Responses are due Dec 8, 2026. Category: Construction - Building. Questions are due 2026-12-02 11:00. Solicitation number 251-27-182.
Wake County Public School System is seeking to secure a contract to provide Boiler Removal and Installation at East Wake Magnet High School located at 5101 Rolesville Road, Wendell NC 27591.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Wake County Public School System is seeking to secure a contract to provide Boiler Removal and Installation at East Wake Magnet High School located at 5101 Rolesville Road, Wendell NC 27591.
Project Scope
Contractors must carry appropriate licenses and/or certifications as required by the State of North Carolina. Contractors shall have adequate and qualified staff in order to provide WCPSS with the services requirements below.
1. Existing BAS system is Schnider Lon/IA with a Tridium Jace running AX 3.8.504.
2. Existing boilers are AERCO Benchmark 2,000 MBH, with a variable primary pump configuration.
3. Primary HW pump to remain is a based mounted 380 GPM pump and each boiler has an existing autoflow set for 100 GPM
4. All work contained in the mechanical room may be done during occupied hours, as long as it is not disruptive to staff/students. All reasonable efforts shall be made to minimize system downtime. All shutdowns must be coordinated with school staff and WCPSS project manager.
5. All work outside of the mechanical rooms must be completed during unoccupied hours.
6. Contractor is responsible for all clean up, protection, patching, fire stopping and repair/replacement of any damaged material.
7. Contractor Shall Verify all existing site conditions in coordination with the mechanical As-Builts provided. Contractors should walk the site prior to the submittal of bid to verify all equipment, and components will fit within the existing space without encroaching on service of other existing equipment.
8. Contractor shall perform all work in accordance with all federal, state and local codes and regulations.
Demolition by Contractor
9. Remove and dispose of existing 2,000 MBH boiler #3.
10. Contractor shall field verify exact locations of existing equipment, piping, flue, combustion air duct, boiler management panel, etc. being removed and remaining before submitting bid.
11. Contractors shall patch all walls, floors, ceiling, roofs, etc. that are disturbed to facilitate the installation of their work. Patching shall match existing finishes.
12. Contractor is responsible for all removal, disconnecting, relocations and reconnecting of existing controls to facilitate the installation of the new boilers.
13. All existing control wires may be reused if possible. Any conductor too short in length, of the wrong type, or damaged shall be replaced as part of this scope.
New Installation by Contractor
14. Contractor to install owner furnished one (1) new AERCO BMK2000 natural gas fired boilers.
15. Contractor shall provide minimum of one year warranty on installation and materials provided [...]
Submit one (1) signed, original response via electronic Vendor Portal (eVP) by the specified time and date of opening. Vendor must include all the pages of this solicitation in their response. Proposals submitted via email or non-sealed in response to this invitation for proposals will not be acceptable.
Required Submittals
The proposals are due no later than **December 8, 2026, at 1:00 PM ET**.
Factors often considered include qualifications, relevant experience, fees, and ability to perform work in a timely manner. WCPSS shall not be required to award the contract to the lowest proposed compensation.
WCPSS reserves the right to require performance bond or other acceptable alternative guarantees from successful bidder without expense to WCPSS.
Certificates of Insurance acceptable to WCPSS shall be filed with WCPSS prior to commencement of the Work. [...] Provider agrees to maintain the appropriate insurance outlined in Exhibit B.
**Non-mandatory site visit:** Prospective vendors are STRONGLY URGED AND CAUTIONED to attend a site visit. Offer valid for 60 days from date of proposal opening unless otherwise stated.