Boiler Replacement Project - East Millbrook MS - Building # 4

Active 251-27-184 RFPConstruction - BuildingWake County Public School System
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Wake County Public School System (North Carolina) posted this RFP on Nov 23, 2026. Responses are due Dec 9, 2026. Category: Construction - Building. Questions are due 2026-12-04 11:00. Solicitation number 251-27-184.

Solicitation details

General information

Solicitation number
251-27-184
Notice type
RFP
Place of performance
North Carolina
Questions due
2026-12-04 11:00

Agency and category

Agency
Wake County Public School System
Category
005Construction - Building
Source listing
Link with a plan

Description

From the agency listing

Wake County Public School System is seeking to secure a contract to provide Boiler removal and installation for East Millbrook Middle School located at 3801 Spring Forest Road, Raleigh NC 27616

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Wake County Public School System is seeking to secure a contract to provide Boiler removal and installation for East Millbrook Middle School located at 3801 Spring Forest Road, Raleigh NC 27616.

Scope

Project Scope:

1. Existing BAS system is Climatec with a Tridium Jace N4.7
2. Existing boiler is a Lochinvar Intellifins 2,000 MBH, with an internal primary pump and secondary pump configuration.
3. Primary HW pump to remain is vertical inline @ 201 GPM.
4. All work contained in the mechanical room may be done during occupied hours, as long as it is not disruptive to staff/students. All reasonable efforts shall be made to minimize system downtime. All shutdowns must be coordinated with school staff and WCPSS project manager.
5. All work outside of the mechanical rooms must be completed during unoccupied hours.
6. Contractor is responsible for all clean up, protection, patching, fire stopping and repair/replacement of any damaged material.
7. Contractor Should verify all existing site conditions in coordination with the mechanical As-Builts provided. Contractor should walk the site prior to the submittal of bid to verify all equipment, and components will fit within the existing space without encroaching on service of other existing equipment.
8. Contractor shall perform all work in accordance with all federal, state and local codes and regulations.

Demolition by Contractor

9. Remove and dispose of existing one (1) 2,000 MBH Lochinvar boiler. Retain existing ¾ HP primary pump and turn over to M&O.
10. Contractor should field verify exact locations of existing equipment, piping, flue, combustion air duct, boiler management panel, etc. being removed and remaining before submitting bid.
11. Contractors shall patch all walls, floors, ceiling, roofs, etc. that are disturbed to facilitate the installation of their work. Patching shall match existing finishes. [...]

New Installation by Contractor

14. Contractor to install owner furnished one (1) new Viessman CI2-2000 natural gas fired boilers. Boiler is located at 1551 Rock Quarry Road.
15. Contractor shall provide a minimum one-year warranty on installation and materials [...]
29. Contractor is responsible for submitting and picking up permit, scheduling and fulfilling all inspections. Permits to be paid by WCPSS
30. Startup has been pre-purchased by WCPSS, once complete and equipment verified ready for operation, contact WCPSS and Carrier will perform startup.

Additional information

Submit one (1) signed, original response via electronic Vendor Portal (eVP) by the specified time and date of opening. Vendor shall bear all risk for late electronic submission due to unintended or unanticipated delay, including but not limited to internet issues, network issues, or local power outages. Vendor must include all the pages of this solicitation in their response.

Required Submittals

  • Qualifications shall include: years in business; office locations; number of full-time staff that will be providing services to WCPSS
  • Relevant experience
  • Cost/Price proposal
  • *Attachment A*

Factors often considered include qualifications, relevant experience, fees, and ability to perform work in a timely manner.

Certificates of Insurance acceptable to WCPSS shall be filed with WCPSS prior to commencement of the Work. [...] WCPSS reserves the right to require performance bond or other acceptable alternative guarantees from successful bidder without expense to WCPSS.

NON-MANDATORY SITE VISIT: Prospective vendors are STRONGLY URGED AND CAUTIONED to attend a site visit to apprise themselves of all data and conditions which will affect the performance of the work and service called for or reasonably implied by this RFP.

Documents

1 file

Subscribe to get this document.

  • 251-27-184 - RFP for East Millbrook MS Boiler Replacement.pdf
    Download

Similar open bids

In North Carolina

More from Wake County Public School System

Open bids