COUNTY OF CUMBERLAND (North Carolina) posted this IFB on Nov 12, 2026. Responses are due Dec 1, 2026. Category: Public Safety & Emergency. Questions are due 2026-11-20 12:00. Solicitation number 600IFB #27-20-ENG.
IFB #27-20-ENG CUMBERLAND COUNTY PUBLIC LIBRARY VIDEO SECURITY SYSTEM
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Cumberland County is soliciting bids for purchase and installation of a video security system for all eight (8) Library branches: Bordeaux, Cliffdale, East Regional, Headquarters, Hope Mills, North Regional, Spring Lake, and West Regional. This video security system must integrate with the County’s existing Avigilon video security system.
Vendor will provide labor, materials, equipment, configuration, and commissioning services to upgrade the video surveillance system at all eight (8) Library branches: Bordeaux, Cliffdale, East Regional, Headquarters, Hope Mills, North Regional Spring Lake and West Regional. This project includes furnishing and installing Avigilon cameras and accessories, providing ACC Enterprise licensing, supplying LAN infrastructure support materials, and performing professional services to deliver a fully functional and operational video security system. “Or equals” will be rejected as this project is an integration with the County’s existing system.
Video Management System (VMS) Licensing
Vendor will provide and activate licensing:
- Avigilon Control Center (ACC) v7 Enterprise Camera Licenses
Licensing will be assigned to the appropriate system and verified for proper operation.
Camera Equipment Furnish & Install
Vendor will furnish and install video surveillance cameras listed at locations listed.
Camera Accessories / Mounting Hardware
Vendor will furnish and install all camera accessories, connectors, and materials as required to support proper installation.
Cabling and LAN Infrastructure Support
Vendor will provide LAN cabling materials as needed for connectivity support.
System Configuration and Programming
Vendor will configure and commission the system to ensure proper operation, including:
Testing, Validation, and Commissioning
Upon completion of installation, vendor will perform validation and functional testing including:
Professional Services
Vendor shall include in quote all professional services required to meet the scope of work of the project - including, but not limited to, configuration, commissioning, technical oversight, installation, field labor, scheduling, coordination, and project closeout.
Freight
Freight should be as a separate line item in the quote.
Warranty
All equipment must be covered by the manufacturer’s warranty. Vendor to warrant their labor for at least ninety (90) days from installation completion.
**Submission:** All bids shall be physically delivered to the office address listed above on or before **2:00 PM** as per the clock in the Purchasing Office of the Finance Department, regardless of the method of delivery. Submit one (1) signed, original executed bid response and one (1) electronic copy on a flash drive. Submit your bid in a sealed package. Clearly mark each package with: (1) Vendor name; (2) the IFB number; and (3) the due date. Any bid received after the bid submission deadline will be rejected.
All bid addendums and/or corrections will be posted on the Cumberland County Vendor Self Service site https://cumberlandcountync.munisselfservice.com/vss/Vendors/VBids/Default.aspx.
Required with bid:
**Award:** IFB will be awarded based on lowest responsive, responsible bidder method of award.
**Cost:** Cost shall be all inclusive and list/identify any shipping or other charges. Exclude all sales tax from your bid.
**Contract term:** The Contract shall have an initial term of one (1) year, beginning on the date of contract award. The COUNTY shall have the option, in its sole discretion, to renew the Contract on the same terms and conditions for up to a total of two additional one-year terms.
**Payment:** The CONTRACTOR will be paid net thirty (30) calendar days after the CONTRACTOR’S invoice is approved by the COUNTY.
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.