North Carolina Central University (North Carolina) posted this RFP on Nov 6, 2026. Responses are due Dec 1, 2026. Category: Construction - Building. Questions are due not later than ten (10) calendar days prior to the proposal due date. Solicitation number 68-31925-CMR.
Richmond Residence Hall - Systems Renewal (advertisement for CMR Services)
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
North Carolina Central University (NCCU) is accepting proposals for a Construction Manager at Risk for the Richmond Residence Hall- Systems Renewal project until 2:00PM December 01, 2026. ONLY ELECTRONIC PROPOSALS SENT TO ahodge22@nccu.edu WILL BE ACCEPTED (PDF).
This project is to bring back online the residence hall through a systems renewal that will address deficiencies by mold remediation, HVAC system replacement, and conversion to a four‑pipe system, installation of a dedicated chiller, upgrades to ventilation units, plumbing repairs, replacement of fire alarm and sprinkler system components, modernization of the building automation and electrical systems, selective finish and lighting replacement, and repairs to elevators and mechanical spaces. The project has an estimated construction budget of $15,820,699.00 and total project budget of $20,000,000.00.
The contractor will be expected to maintain a secure work site at all times, minimize noise and disruption to ongoing campus operations where practical, coordinate deliveries and material staging to avoid conflicts with pedestrian and vehicular circulation, and comply with all campus access, security, and safety requirements. Power and utility outages must be carefully planned and coordinated, as these can impact other occupied facilities on campus. Advance notification and coordination with the Owner will be required to minimize impacts to campus operations.
The successful Construction Manager at Risk should demonstrate experience collaborating with the Design Team during the design phase, renovating occupied institutional and higher education campus facilities; delivering such projects to Final Acceptance by the AHJ on-schedule (without contractor-driven delays); coordinating work within active environments; and delivering large scale renovation projects involving existing building systems.
Proposed Schedule Overview
**ONLY ELECTRONIC PROPOSALS** sent to ahodge22@nccu.edu will be accepted (PDF).
Selection of Construction Manager at Risk is anticipated by December 16, 2026.
All proposals shall include the information requested by the *Qualifications Questionnaire*. Proposers must possess all licenses required by North Carolina law, including, at a minimum, an unlimited general contractor's license in the building classification under N.C.G.S. Chapter 87, and shall submit proof of current licensing with their proposal.
A Proposer, to be considered, must have a minimum of five (5) years of experience as a Construction Manager or General Contractor. The package length should not exceed twenty (20) double-sided pages.
The Pre-selection Committee will form a shortlist of three to six firms. The Owner will receive an oral presentation from each firm that is short-listed by the Pre-selection Committee.
The Construction Management Fee will be a fixed number that will be reasonably negotiated between the CM at Risk, the Owner and the State Construction Office.
The State of North Carolina reserves the unqualified right to reject any and all proposals
Subscribe to get these 2 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.