City of Charlotte (North Carolina) posted this RFP on Nov 18, 2026. Responses are due Dec 30, 2026. Category: Construction - Building. Questions are due 2026-12-28 15:00. Solicitation number 269-2027-045.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Spectrum Center is seeking to replace the existing static vomitory signage throughout the lower and upper seating bowls with new digital signage systems. The project will include the removal and disposal of existing signage and the furnishing and installation of new digital displays at designated vomitory locations. The new system is intended to provide dynamic, programmable content for facility messaging, event information, advertising, and branding.
The objective of this RFP is to solicit Proposals that will enable the City to determine which Company and Proposed Solution will best meet the City’s needs for the Services detailed in the Scope of Work.
The selected Contractor shall provide a complete, turnkey digital signage system, including all required design, engineering, permitting, equipment, materials, labor, supervision, delivery, rigging, installation, programming, testing, and commissioning. The Contractor shall field verify existing conditions and coordinate the new signage with existing structural, electrical, data/signal, network, audio, and control infrastructure.
The work shall include preparation of project-specific shop drawings, electrical and signal drawings, equipment layouts, mounting and attachment details, and required engineering certifications. The Contractor shall evaluate existing structural conditions and provide engineered attachment systems, support framing, and modifications necessary to support the new displays. All required engineering shall be performed by appropriately licensed professionals.
The Contractor shall provide and coordinate all electrical, data, signal, and control infrastructure required for a complete installation, including power distribution, dedicated circuits, conduit, cabling, fiber connections, terminations, remote power controls, network connectivity requirements, control computers, and associated equipment. Final power requirements, including 120V or 120/208V service, shall be coordinated with the selected equipment and existing facility infrastructure.
The new vomitory digital signage shall operate within the existing control system ecosystem. The installer is responsible for furnishing and installing any additional equipment, infrastructure, interfaces, software, modifications, and integration components required for proper operation. The scope shall include complete system integration, testing, commissioning, and verification of functionality with the existing control system. The connectivity for each screen must be DVI, BNC, or compatible connection that securely attaches to the screen.
The Contractor shall also be responsible for equipment delivery, unloading, inspection, storage, mounting, system setup, programming, testing, and final commissioning. All work shall be coordinated with Spectrum Center, Charlotte Regional Visitors Authority (CRVA), and the facility event schedule. Upon completion, the Contractor shall provide a fully operational digital signage system, complete all required cleanup, and submit applicable warranties, record drawings, equipment documentation, and other required closeout materials.
Proposals must be submitted electronically through the Procurement Portal (https://charlottenc.bonfirehub.com) on or before the Due Date in order to be accepted. Proposal submissions are due no later than **December 30th, 2026 at 3 PM EST**.
For a company to receive Drawings and Plans they must first sign and submit the NDA form that has been provided with this listing. Signed NDA’s shall be sent via email to: lyandra.veloz@charlottenc.gov or robert.andrews@charlottenc.gov
Firms must bid on all line items in the Price Schedule to be considered compliant. Submitted pricing, must be Landed and include all direct and indirect costs.
Evaluation criteria
A Non-Mandatory Site Walk Through will be held at the Spectrum Center (333 E Trade Street) at 9:30 AM EST on December 17, 2026.
Any exceptions to the Sample Contract must be uploaded in word format (with redlines/tracked changes). If awarded a contract, your company will be required to provide an insurance certificate(s) that meets or exceeds the requirements set forth in the Sample Contract. Services Commence March 2027.
Subscribe to get these 15 documents.