North Carolina Department of Transportation – Ferry Division

Active SCO-DOT-Ferry Manns Harbor Shipyard-Water Infrastructure (11-2026) RFQuArchitecture & EngineeringNorth Carolina Department of Transportation
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

North Carolina Department of Transportation (North Carolina) posted this RFQu on Nov 17, 2026. Responses are due Dec 16, 2026. Category: Architecture & Engineering. Solicitation number SCO-DOT-Ferry Manns Harbor Shipyard-Water Infrastructure (11-2026).

Solicitation details

General information

Solicitation number
SCO-DOT-Ferry Manns Harbor Shipyard-Water Infrastructure (11-2026)
Notice type
RFQu
Place of performance
North Carolina

Agency and category

Agency
North Carolina Department of Transportation
Category
007Architecture & Engineering
Source listing
Link with a plan

Description

From the agency listing

Manns Harbor Shipyard - Water Infrastructure Upgrades

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Water Infrastructure Upgrades at the Manns Harbor Shipyard located at the North Carolina Shipyard in Manns Harbor and operated by the NCDOT Ferry Division.

The existing water and wastewater infrastructure is in very poor condition and multiple failure points exist that could create indefinite work stoppages at the site.

**Total Project Budget:** **$18,121,000** (with **$9,000,000** in currently available funds)

**Source of Funds:** Non-General Fund, Agency Receipts

Scope

New well treatment and pumping facilities to address contaminant and flow issues, potable water chemical treatment & reverse osmosis system, supply line testing and repair to address leaks throughout the site, a new concrete water storage tank to replace a failing elevated water tower (age/corrosive environment), an oil water separator for treatment of multiple wastewater streams, new treatment plant discharge infrastructure that will allow for on-site discharge rather than off-site hauling, fire suppression system upgrades (fire pump & sprinkler systems), and associated civil work to include new piping to tie into new and existing facilities.

Additional information

**Submission:** Proposing firms must submit **THREE (3) copies** of the *Letter of Interest* and **THREE (3) copies** of your current *Standard Form 254 (SF 254)* with the information package. The current SF 254 template is located at http://ncadmin.nc.gov/businesses/construction/forms-documents which is the State Building Commission approved form.

  • Mailing Address: NCDOT Facilities Management Unit, 1525 Mail Service Center, Raleigh, NC 27699-1525
  • Fed Ex/UPS Delivery Address: NCDOT Facilities Management Unit, 1 S. Wilmington St, Room 406B, Raleigh, NC 27601

The submitted information package should not include any notebooks, binders, tab, clips, etc. The format should be 8-1/2" x 11" pages stapled in the upper left-hand corner. The Letter of Interest should not exceed ten (10) single-sided pages or five (5) double-sided pages plus the SF 254.

E-mail and Fax submittals will not be accepted.

In order to offer architectural, engineering, or landscape architectural services in response to this solicitation, the proposing firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina.

Selecting criteria

In selecting designers, the selection committee should take into consideration qualification information including such factors as:

1. Specialized or appropriate expertise in the type of project.
2. Past performance on similar projects.
3. Adequate staff and proposed design or consultant team for the project.
4. Current workload and State projects awarded.
5. Proposed design approach for the project including design team and consultants.
6. Recent experience with project costs and schedules.
7. Construction administration capabilities.
8. Proximity to and familiarity with the area where the project is located.
9. Record of successfully completed projects without major legal or technical problems.
10. Other factors which may be appropriate for the project.

Documents

1 file

Subscribe to get this document.

  • SCO-DOT-FerryMannsHarborShipyard-WaterInfrastructure (11-2026).pdf
    Download

Similar open bids

In North Carolina

More from North Carolina Department of Transportation

Open bids