City of Charlotte (North Carolina) posted this RFQu on Nov 19, 2026. Responses are due Jan 6, 2027. Category: Architecture & Engineering. Questions are due 2026-12-29 17:00. Solicitation number FY27-RFQ-06.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Storm Water Services (Storm Water) is soliciting Statements of Qualifications (SOQ) from qualified engineering companies (Company or Proposer) to provide Professional Engineering Services for the Unspecified Water Quality Enhancement Projects & Unspecified Stream Restoration Projects (Project).
Storm Water reserves the right to enter into one or more contracts with any company selected under this RFQ.
Scope A: Unspecified Pond/Dam and Water Quality Improvement Projects
The City anticipates selecting one (1) or more firms to provide these services on a task order basis for several pond and dam rehabilitation/ stormwater control measure (SCM) projects. This will include initial feasibility studies, planning and design for projects that are not specified at this time. Additional tasks will include evaluation and repair design of existing municipal SCM projects. These projects are anticipated to start scoping upon contract award.
The selected firms will use HEC-HMS, HEC-RAS, SWMM, and/or a hydraulic grade line closed system computer model, or an approved alternative method. All methods will be in accordance with the Charlotte-Mecklenburg Storm Water Design Manual. The City's then current AutoCAD standards will be used for production of all plans and profiles.
Work will be issued via written Task Orders, which will specify the requirements of the various projects. Multiple Task Orders may be issued for each project. Multiple task orders may be issued at once.
Scope B: Unspecified Stream Restoration Projects
The City anticipates selecting up to three (3) firms to provide these services on a task order basis for several stream and wetland restoration projects. This will include initial feasibility studies, planning and design for projects that are not specified at this time. [...] Additional tasks may include repairs of areas of concern on existing completed projects or projects in long-term stewardship.
Task orders may include any of the following:
Submission
Proposals must be submitted electronically through the Procurement Portal (https://charlottenc.bonfirehub.com) no later than the date and time stated in the Schedule of Events. Please limit your proposal to twenty (20) pages.
Evaluation Criteria
Pursuant to North Carolina General Statute 143-64.31, Storm Water Services is conducting a "qualifications-based" selection process without regard to fee.
The City intends to negotiate a 10% SBE subcontracting goal with the selected Company(ies). The Company is **required** to submit the *CBI Form 3* attached in Exhibit 1. Failure to submit this form with the Proposal shall render the Proposal non-responsive.
Insurance
The selected firm will be required to provide certificates of insurance and copies of their insurance policies evidencing coverage for professional liability in the minimum amount of **$1,000,000**; automobile liability in the minimum amount of **$1,000,000**; commercial general liability in the minimum amount of **$1,000,000**; and workers' compensation insurance as required by North Carolina statutes.
Interviews with companies are not anticipated, but may be held at the option of the selection committee.
Subscribe to get these 6 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.