Montgomery County, Ohio, is requesting Statements of Qualifications (SOQ) for PP-2026-0075 - Historic Courthouse Renovation Design Services.
The selected consultant shall provide professional architectural and related engineering services for the renovation and modernization of existing interior space within a Historic Courthouse at Courthouse Square. Programming and schematic design services have been completed and will be provided.
The consultant will be responsible for advancing the project through design development, preparation of construction documents, permitting support, and bidding services. Work shall include evaluation and incorporation of existing conditions, coordination of applicable building systems, integration of Owner requirements, and preparation of documents necessary to facilitate construction.
**Deliverable stages** (electronic copies submitted for review; sections required only as applicable to the project)
The final submission will include one set of drawings using an approved format, one full size plan set one project copy AutoCAD current version and one project copy in REVIT, one original 8½" x 11" unbound set each of specifications, calculations, and cost estimates. The construction bid will be a single prime contract bid. The A/E will be responsible to answer questions, attend the construction pre-bid conference, prepare addenda as necessary during the bidding process, and assist with analysis of bids.
The A/E is responsible for submission of the bid documents (as many as three or four copies) to the code official for securing a building permit (concurrent with submitting the bid documents to the County) and is responsible for answering and resolving questions. Permit fees and review fees will be paid by the County.
Other bid documents
Construction Administration
The A/E shall provide as-built drawings incorporating changes made since bid drawings including the architectural, mechanical, electrical, site, and structural drawings. During the first year of operation, the A/E will visit the facility and evaluate how the facility is operating (at 3, 6, 9, and 12 months).
The Architect was selected by the Board following the qualification-based selection process required by Ohio Revised Code Sections 153.65, et seq. [...] It is anticipated that the Project will be funded in part, through the American Rescue Plan Act (ARPA) and will be subject to compliance with the requirements for ARPA funded projects.
The term of this agreement shall be from the date of approval of this Agreement by the Board or until certification by the Montgomery County Auditor, whichever event occurs last, and shall terminate upon Final Completion of the Project.
**Insurance** (minimum limits, per the *Agreement for Architectural Services*)
Insurance is to be placed with insurers with an "A.M. Best" rating of not less than A IX.