Miami University (Ohio) posted this RFP on Nov 16, 2026. Responses are due Dec 1, 2026. Category: Construction - Building. Questions are due 2026-11-20 14:00. Solicitation number 1120262503.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Miami University (MU) is actively seeking proposals to replace the existing battery banks, chargers, and associated equipment within Switch House 4 (SH4). We have a total of two battery banks with (92) Nickle-Cadmium (NiCad) cells per bank. Each bank has a charger that will be replaced at the same time the associated bank is replaced.
Each bank is ~125VDC that ties to a transfer switch and provides control power to the Medium Voltage Switchgear for breaker operations, protective relays, and monitoring. The two battery banks are redundant to each other. Only one bank will be taken off line at a time. This equipment is at end of life. Recycling of the existing batteries will be orchestrated by MU PM.
Basis of Design Equipment
Scope of Work
1. Isolate Battery Bank #1 (BB-1), coordinate with MU PM. Disconnect and remove the isolated battery bank, charger, and existing racking. Salvage existing wiring and power for charger for reuse.
2. Contractor to skid old batteries one layer high for recycling by MU PM. Reuse skids from new equipment.
3. Provide and install the equipment listed above and all associated material as required to put BB-1 back into service.
4. Once BB-1 is complete, coordinate with MU PM to switch over power to new BB-1 and isolate/remove from service BB-2.
5. Provide same scope for BB-2 as listed in items 1-3 above.
6. Provide all deliverables as required.
Testing
- Each battery bank and corresponding charger shall undergo acceptance testing per IEEE, NETA and manufacturer's specifications. Testing shall include a capacity discharge test performed in accordance with IEEE 1106-2015 and manufacturer's specifications. Any deficiencies found shall be corrected by the contractor and re-testing shall be performed as required. (See Deliverables below)
Notes
1. Alternates may be submitted and approved during the bidding phase and shall be equal to or higher quality than the equipment as listed in the Basis if Design. Equipment shall be 100% compatible as a complete and operating system. Alternates **MUST** be approved in writing by the MU PM 5 days prior to bid due date.
2. All associated battery connectors/jumpers, hardware, and leads are to be provided as one assembly. Racking shall be two tier; two step seismic racks designed for use with batteries as listed.
3. The contractor shall provide and install all associated material for a complete and operational system.
Deliverables
Bids are to be submitted via the University's Ionwave bidding portal at https://miamiu-ohiousourcing.ionwave.net no later than **2:00PM on December 1, 2026**. Bids are to be submitted on the attached *Bid Form* only. A completed *Responsible Bidder Information Form* must be submitted with the *Bid Form*.
Bids may be withdrawn up until the time of the bid opening. Bids may not be withdrawn after opening and shall be firm for a period of 60 days.
The on-site Work shall commence on or before January 4, 2027 and shall be substantially completed by June 30,2027 (the "Completion Date"). Site visits can be scheduled by coordinating with Joel Fellman fellmajl@miamioh.edu or Cory Dorton dortonc@miamioh.edu.
The Work is subject to the prevailing wage requirements of ORC Chapter 4115. Domestic steel use requirements as specified in Section 153.011, ORC apply to this project.
Insurance: Commercial General Liability of **$1,000,000** each occurrence and **$3,000,000** general annual aggregate; Builder's Risk Insurance is required, along with Workers' Compensation.
Pay Applications shall be completed on state SOV F330-2 form. This will be provided by the MU PM once under contract.