Department of Transportation (Oregon) posted this RFQ on Nov 23, 2026. Responses are due Dec 9, 2026. Category: Construction - Building. Questions are due 7 calendar days prior to the Closing (Bid Opening Date) identified in OregonBuys for this RFCQ.. Solicitation number S-73000-00018456.
ODOT is seeking one qualified contractor to supply and install a mobile home as specified at the Santiam Junction Maintenance Station.
(Site preparation will be performed by others.)
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The purpose of this RFCQ is to establish a Contract for supplying and installing a mobile home at the Santiam Junction Maintenance Station for the benefit of ODOT.
The work contemplated under the Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction Work in connection with the project described in the Contract Documents.
Home
The manufactured home must meet all of the following dimensional and layout requirements:
Home must comply with Oregon Manufactured Dwelling Installation Specialty Code and Safety Standards (24 CFR Part 3280). Roof load, wind load, and thermal zone ratings must meet Oregon requirements. Factory-built height must not exceed 11 feet. No post-delivery modifications may increase the height.
Transportation and Delivery
Contractor is responsible for transporting the home to the project site in Santiam Junction, Oregon. Transported unit must comply with Oregon oversize-load regulations, including height limits. The home must arrive at or below 11 feet in total height, eliminating the need for oversize-height permits.
Installation
The Contractor must provide complete installation of the manufactured home unit, including all labor, equipment, stairs, and materials necessary to place the home in its final, code-compliant position on the project site. Requirements include:
Precast Wall Panel Foundation System
Provide precast concrete perimeter wall panel system as the primary foundation enclosure. Panels shall be factory-produced reinforced concrete meeting structural requirements. Include all connectors, bearing pads, leveling shims, and anchorage hardware.
Submittals
The Contractor must provide the following with the bid package:
Quotes must be submitted through the OregonBuys system. Quotes submitted by any other means will be rejected.
Offeror must be a registered Vendor in OregonBuys. Offeror must complete and submit the *Offeror Information and Certification Form* (Attachment A, Form A-1) and complete online entry of all required pricing information.
Offeror must be licensed with the State Construction Contractors Board (“CCB”) prior to offering on Public Improvement Contracts. Contractor and every Subcontractor shall have a Public Works bond filed with the CCB before starting Work on the project.
ODOT will award a Contract to the responsible Offeror that submits a responsive Quote with the lowest total Quote Price for the items selected for award. Award will be made to one Offeror only.
An Offer is a firm offer, irrevocable, valid, and binding on the Offeror for not less than 30 calendar days from the Closing.
This RFCQ and resulting Contract are subject to the Bureau of Labor and Industries (“BOLI”) prevailing wage rate requirements. The Work will take place in Linn County, BOLI Region 4.
Liquidated damages of $300.00 per calendar day will apply for failure to complete the project by the Substantial Completion Date.
The apparent successful Offeror shall submit certificates of insurance for all coverages required by this RFCQ no later than seven calendar days after the date of ODOT’s notification of intent to award.
No public Opening of Quotes will be held.
Subscribe to get these 4 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.