35X 201224 Re Match Usa Cleanup Project

Active 6100066997 IFBEnvironmental ServicesDepartment of Environmental Protection
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Department of Environmental Protection (Pennsylvania) posted this IFB on Nov 13, 2026. Responses are due Dec 14, 2026. Category: Environmental Services. Solicitation number 6100066997.

Solicitation details

General information

Solicitation number
6100066997
Notice type
IFB
Place of performance
Pennsylvania

Agency and category

Agency
Department of Environmental Protection
Category
008Environmental Services
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Commonwealth of Pennsylvania (“Commonwealth”), Department of Environmental Protection (“DEP”), Bureau of Waste Management is seeking professional services to conduct a removal/clean-up action of solid waste and other materials at the Len’s Concrete Services facility (“Len’s Concrete”). A portion of the property was contracted to Re-Match USA, Inc. as a storage site. Len’s Concrete is located at 1956 US 22, Jonestown, Pennsylvania in Swatara Township, Lebanon County (“Jonestown Facility”).

Solid waste and other materials abandoned at the Jonestown Facility include, but are not limited to, approximately 4,000 tons of rolled waste artificial turf, crumb rubber, and sediment controls.

Scope

The Purpose of this removal/clean-up action is to remove all waste artificial turf, crumb rubber, and other materials that are abandoned at the Jonestown Facility and to remove threats to the public health and environment from solid wastes that currently or may exist on the Jonestown Facility.

The Contractor shall be required to perform the following:

  • Pack, re-pack, over-pack, consolidate, or any combination of them, as appropriate, solid waste and other materials and stage and prepare shipping containers of solid waste and other materials for transport as required by law or regulation;
  • Arrange for proper reuse, recycling, treatment, processing, disposal, or any combination of them, of solid waste and other materials at facilities approved or permitted by DEP using licensed waste transporters or authorized/approved haulers;
  • Upon notification from DEP, provide a written Work Plan within two weeks to DEP and mobilize and prepare to begin work at the Jonestown Facility within 30 calendar days of this notification;
  • Submit Weekly Activity Reports via e-mail by close of business on the Monday following the previously completed week;
  • Provide other project status reports, notifications, or correspondence as may be appropriate or requested by DEP.

The project objectives established by DEP for the Jonestown Facility are to:

  • Provide safe staging and storage of containers, solid waste, and/or other materials;
  • Provide for proper packaging and shipment of the waste artificial turf, crumb rubber, and other materials to permitted or DEP approved off-site reuse, recycling, treatment, processing, disposal, or any combination of them, facilities using licensed waste transporters or authorized/approved haulers;
  • Remove and properly dispose of any installed sediment controls (silt socks, silt fencing, etc.) utilized to prevent migration of crumb rubber and/or other materials.

The Contractor shall include all labor, materials, equipment, and incidental costs necessary to complete the work described in compliance with existing permits and prevailing environmental regulations.

The Contractor shall perform a final sweep/vacuum of the storage pad area to remove any residual debris/crumb rubber remaining after the waste artificial turf removal. Where applicable, the soil surrounding the storage area will be scraped clean to remove any residual debris/crumb rubber that migrated off pavement.

The Contractor will submit an End of Project Report documenting the removal/clean-up work within 30 calendar days of completion of site work. The Contractor will submit one electronic copy (PDF).

Additional information

**Mandatory** attendance at the pre-bid site inspection is a prerequisite for bidding on the project. Failure to attend this mandatory pre-bid meeting will result in your bid being rejected as non-responsive.

All Bids must be submitted **electronically through the Department of General Services’ (“DGS”) eMarketplace website**. The eMarketplace website is located at http://www.emarketplace.state.pa.us.

The Contract will be awarded to the lowest responsible and responsive bidder. Unit prices shall include all labor, materials, equipment, and incidental costs necessary to complete the work. No additional line items are permitted.

The Contractor shall purchase and maintain, at its own expense, Workers’ Compensation Insurance, Comprehensive General Liability Insurance, and Automotive Liability Insurance. The amount of public bodily injury insurance shall not be less than **$1,000,000** per occurrence. Such policy shall name the Commonwealth and the property/landowner as additional insureds.

The Contractor shall commence work within 30 days of receipt of the purchase order, terminate work within 60 days following the commencement of work, and submit the End of Project Report within 30 days of the termination of work.

Documents

2 files

Subscribe to get these 2 documents.

  • Re-Match_Bid_Jonestown_revised 8.4.26clean.FINAL.V1.docx
    Download
  • BOP-2201 EO 2021-06 Worker Protection Form BOP FINAL.docx
    Download

Similar open bids

In Pennsylvania

More from Department of Environmental Protection

Open bids