The Nature Conservancy (Pennsylvania) posted this RFP on Nov 16, 2026. Responses are due Dec 14, 2026. Category: Environmental Services. Questions are due 2026-11-24 23:59. Solicitation number The Nature Conservancy.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
It is the intention of The Nature Conservancy (“Conservancy” or “TNC”) to solicit Proposals for the provision of Floodplain Restoration Design to Reduce Flood Risk and Enhance Habitat in the Lower Darby Creek Watershed (PA). Those receiving this Request for Proposal (“RFP”) are referred to as “Supplier”.
The Nature Conservancy in Pennsylvania and is seeking to contract a Supplier to provide services on floodplain restoration design to reduce flood risk and enhance habitat in the lower Darby Creek watershed in PA. This project would result in preliminary design for floodplain restoration at two sites in our watershed study area to mitigate flood risk from storms and enhance habitat for fish and wildlife in a densely populated watershed in southeast Pennsylvania.
Assignment Scope of Work
The Supplier shall respond to the scope of work outlined in this RFP. The Supplier may deviate from this scope; however, they should clearly note and explain the reasons for the deviation. The final scope of work may be adjusted based on the selected Supplier's proposal.
Community engagement
A community workshop will be held to review the StoryMap webpage and discuss plans for the preliminary design process for the two proposed sites. [...] A rubric will be developed for evaluating preliminary design elements based on community priorities and values.
Data collection and development of conceptual schematic
A base map including property lines and existing features will be developed using aerial imagery and existing publicly available data including data on soils, wetlands and topography. [...] The data collection is expected to include elevation (lidar), soil borings with sediment analysis, wetland delineations, and hydrodynamic/hydraulic modeling. A conceptual schematic will be created and used for sharing design concepts during meetings and moving towards community consensus on design elements.
30% design for 84th Street Bridge and Woodland Loop Trail sites
Develop preliminary 30% designs for the 84th Street Bridge site and the Woodland Loop Trail site to evaluate methods for reconnecting existing floodplains which are currently disconnected from Darby Creek, in order to increase their ability to retain and infiltrate water and slow down stormwater flows. [...]
60% design for Woodland Loop Trail site and community event
This project site will also include trail infrastructure for recreational access. Because this site is under the jurisdiction of the USFWS, we are proposing to further advance the preliminary design to 60%. [...] The main goal of this project would be to restore tidal connection to Darby Creek.
Identify data needs and regulatory pre-application meeting
Identify additional data needed to take projects to final design. We will hold a regulatory pre-application meeting to prepare for final design and permitting phase.
Submission
Suppliers must submit their proposals through kim.hachadoorian@tnc.org on or before the submission due date and time indicated in Section 1.10. Any proposal received after the specified date and time will be disqualified from proceeding to the evaluation stage. TNC will not accept hardcopy proposals.
The Supplier’s proposal will be submitted as either a PDF or Word document in line with the two-part submission below:
The Conservancy requests a firm fixed price for this assignment.
Evaluation
In general, the Proposals will be evaluated based on the following evaluation criteria:
Mandatory requirements
The Supplier shall provide a copy of its current certificate of insurance showing the types and limits of insurance in effect as of the Proposal submission date. If selected for contract award, the Supplier will then be required to add the Conservancy to its certificate of insurance before signing the contract.
TNC’s applicable payment terms are net 30 (calendar days).