Lehigh Carbon Community College (Pennsylvania) posted this IFB on Nov 3, 2026. Responses are due Dec 11, 2026. Category: Construction - Building. Questions are due 2026-12-02. Solicitation number Lehigh Carbon Community College, Lehigh County.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
NOTICE IS HEREBY GIVEN that Lehigh Carbon Community College will receive sealed bids online, via the PennBid Program at www.pennbid.net until 12:00:00 PM, prevailing time on December 11, 2026 for the construction of the Biotechnology Training Facility located in Lehigh County at 4525 Education Park Drive, Schnecksville, PA 18078.
This project consists of the renovation of approximately 7,990 square feet of existing interior space to accommodate a biotechnology training laboratory.
The scope of work for this project includes the provision of all labor, materials, tools, supervision and permits, to renovate an portion of the first floor of Science Hall. The scope of work for this project includes, but is not limited to, renovating the existing first floor of Science Hall to create a new, state-of-the-art Biotechnology Laboratory and Training Facility. The project includes renovation of existing laboratories, classrooms, storage areas, and offices to accommodate two biotechnology teaching laboratories, laboratory support and storage spaces, a biotechnology lecture hall, aseptic fill and automated fill training rooms, office space, and associated support areas. Work includes demolition, new partitions, ceiling / light fixtures, casework, flooring and other finishes. HVAC, plumbing, and electrical work are included in the renovation. Exterior work includes refurbishment of the existing patio area.
Alternate Bid Item: Removal and replacement of existing windows in area of work.
Construction will be bid for the following Prime Contracts:
- Contract No. 1 – General Construction Contract;
Either a Certified Check or a Bid Bond (with a corporate surety authorized to do business in Pennsylvania) drawn to the order of Lehigh Carbon Community College in the amount equal to ten percent (10%) of the amount of the bid **must be submitted with each bid** as security. A Performance Bond in the amount of 100% of the contract shall be furnished by the successful bidder as detailed in the Instructions to Bidders.
This project is subject to the Pennsylvania Prevailing Wage Act, approved August 15, 1961, P.L. 987 (Act No. 442), as amended and supplemented.
Immediately following the due date and time, all bids received at the College will be opened publicly at 2:00PM on December 11, 2026 and referred to the owner for final award.
Except as otherwise provided by law, no bidder may withdraw his bid within ninety (90) consecutive calendar days after the actual date of opening thereof, or one hundred twenty (120) consecutive calendar days if the award is delayed by a required approval of another governmental agency, the sale of bonds or the award of a grant or grants.
Subscribe to get these 2 documents.