On-call, Multidisciplinary Contracting Firms for Site Preparation

Active 143 [Department] IFB IFBConstruction - Heavy & CivilUrban Redevelopment Authority of Pittsburgh
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Urban Redevelopment Authority of Pittsburgh (Pennsylvania) posted this IFB on Nov 16, 2026. Responses are due Feb 1, 2027. Category: Construction - Heavy & Civil. Questions are due 2027-01-22 00:00. Solicitation number 143 [Department] IFB.

Solicitation details

General information

Solicitation number
143 [Department] IFB
Notice type
IFB
Place of performance
Pennsylvania
Questions due
2027-01-22 00:00

Agency and category

Agency
Urban Redevelopment Authority of Pittsburgh
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Urban Redevelopment Authority of Pittsburgh (the "URA") is seeking competitive bids ("Bid(s)") from responsible and qualified contractors to be included on a panel of contractors to provide on-call site preparation, demolition, earthwork, utility, drainage, E&S-control, and site restoration services throughout the City of Pittsburgh.

The objective is to obtain qualifications and pricing from qualified contractors to help prepare vacant, underutilized parcels for future development. Individual parcels may require different combinations of services including and not limited to structure demolition, earthwork, utility, etc. to become pad-ready for future development. Inclusion in the slate of contractors does not guarantee work.

Scope

The contractor shall furnish all labor, supervision, material, equipment, tools, hauling, disposal, testing, temporary controls, and other services necessary to complete the work in accordance with the approved plans, specification, permits, and applicable regulations.

Mobilization, Protection, and Preparation

  • Mobilization and demobilization of personnel, equipment, temporary facilities, and materials
  • Review site constraints, access routes, utilities, environmental information, and permits
  • Provide temporary fencing, signage, traffic controls, and protection
  • Document pre-existing conditions
  • Coordinate with project team and consultant

Site Clearing

- Remove and haul vegetation, trees, and other surface growth

Demolition

  • Obtain demolition permits and coordinate all necessary inspections
  • Coordinate utility disconnection
  • Demolish and remove completely all buildings, garages, structures, vaults, sheds, storage bins, bollards, interior steps, stoops, canopies, interior and exterior cyclone fencing, retaining walls, various pipe railings, various concrete structures, miscellaneous debris.
  • The basement and site voids created by the demolition of the structures and the completion of the site clearance demolition are to be backfilled to the elevation of the surrounding area. Only clean fill shall be used in the backfill operation.

Excavation, Earthwork, and Grading

  • Scope may include: excavation, trenching, cut & fill, rough grading, finish grading and compaction to lines, and grades. Specification and approved drawing to be provided by URA.
  • Supply, place, and compact approved fill and topsoil as per plan and specifications
  • Remove and haul unsuitable soil and buried materials

Utilities

  • Disconnect, cap, and abandon all utilities including water, sanitary sewer, stormwater, gas, electric, and telecommunication services in the work area
  • Per plans and specifications provided by the URA, install water services, sanitary sewer, drainage piping, inlets, manholes, underground conduit, and other utility infrastructure

Stormwater, Erosion, and Sediment Control

  • Where specified, install and maintain silt fence, inlet protection, entrance, sediment controls, and other measures
  • Protect basins, streams, streets, and drainage facilities

Environmental

The contractor shall comply with all applicable environmental requirements, handling, and disposal.

Permits, Inspections, and Closeout

The Contractor shall secure permits, arrange inspections, and coordinate approvals where required.

Additional information

All bids must be submitted electronically via IonWave. No bids shall be accepted in person, by U.S. Mail, by private courier service, via oral or email communication, telephone or fax transmission.

Bids will be accepted no later than 05:00PM prevailing time on Monday, February 01, 2027, and must be submitted to the URA through IonWave Technology (IWT).

All parties interested in visiting the site(s) must notify the URA at least twenty-four (24) hours in advance of the requested site visit. Please email Gordon Hall, Project Manager at ghall@ura.org to obtain information for site(s) visits.

Contractor shall submit a Non-Collusion Affidavit with the URA with the submission of the Bid.

The selection of any Bids will be made by the URA Board of Directors after receiving the recommendations of URA staff. Selection will be based on the nature, quality, and completeness of the contractor's bid, and its ability to perform the Scope of Work.

  • Qualifications and relevant experience.
  • Demonstrated understanding of the Scope of Work.
  • Past performance with the URA and the City of Pittsburgh.
  • Project team structure and staffing plan.
  • Commitment to M/WBE participation.
  • Clarity, organization, and quality of the submission.
  • Competitiveness and transparency in the proposed fee.

Documents

8 files

Subscribe to get these 8 documents.

  • Bid Invitation.pdf
    Download
  • Larimer_Assemblage_1_043026.pdf
    Download
  • Allentown_Assemblage_031226.pdf
    Download
  • Arlington Heights_Assemblage_031226.pdf
    Download
  • Larimer_Assemblage_2_043026.pdf
    Download
  • URA On-call Contracting Firms RFB- 09.16.26.pdf
    Download
  • Beltzhoover_Assemblage030926.pdf
    Download
  • Homewood_Assemblage_031226.pdf
    Download

Similar open bids

In Pennsylvania