Possum Valley Municipal Authority Center Mills Water Line

Active Possum Valley Municipal Authority, Adams County, PA ITBConstruction - Heavy & CivilPossum Valley Municipal Authority
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Possum Valley Municipal Authority (Pennsylvania) posted this ITB on Nov 18, 2026. Responses are due Dec 9, 2026. Category: Construction - Heavy & Civil. Solicitation number Possum Valley Municipal Authority, Adams County, PA.

Solicitation details

General information

Solicitation number
Possum Valley Municipal Authority, Adams County, PA
Notice type
ITB
Place of performance
Pennsylvania

Agency and category

Agency
Possum Valley Municipal Authority
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Furnish equipment, labor and materials required to furnish and lay approximately 1379 LF of 6” ductile iron water pipe with necessary water service lines, connections and disconnections with existing pipe.

Scope

This section consists of all excavation and backfill activities involved in work under this contract.

Begin new water line at STA 0+00 and connect to the existing 6"ø water main. End of proposed water main at STA 13+79, connect to existing 6"ø water main. Proposed 6" line, shutoff valves, fire hydrants, blowoff valves and water service connections are shown on the plans.

Copper water service lines will be placed in trench on clean native material and backfilled with clean earth backfill.

Additional information

The CONTRACTOR shall perform all work in conformance with PA Act 172 (PA One Call).

Notify the appropriate County Conservation Districts a minimum of (7) days prior to the start of construction or in accordance with the permit.

Within forty-five days after issuance of the Notice To Proceed, submit to the OWNER OR OWNER REPRESENTATIVE five copies of a practicable and feasible progress schedule showing the order in which the Work is to be carried on.

Documents

5 files

Subscribe to get these 5 documents.

  • 260416 CM Water Line BID FORM.doc
    Download
  • 260416 CM Water Line PennBid ADVERTISEMENT.doc
    Download
  • 260416 draft Water Line Specs.docx
    Download
  • 260903 final CM Water Line plan set.pdf
    Download
  • 261104 final CM Water Line Pennbid bid document.doc
    Download

Similar open bids

In Pennsylvania