Relocation of Schoolhouse Well Treatment System Project

Active Burnside Borough, Clearfield County IFBConstruction - Heavy & CivilBurnside Borough
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Burnside Borough (Pennsylvania) posted this IFB on Nov 18, 2026. Responses are due Feb 1, 2027. Category: Construction - Heavy & Civil. Solicitation number Burnside Borough, Clearfield County.

Solicitation details

General information

Solicitation number
Burnside Borough, Clearfield County
Notice type
IFB
Place of performance
Pennsylvania

Agency and category

Agency
Burnside Borough
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Burnside Borough (Owner) is requesting Bids for the construction of the following Project: RELOCATION OF SCHOOLHOUSE WELL TREATMENT SYSTEM

Bids for the construction of the Project will be received via either the PennBid.net website or hard copy hand delivered to the Burnside Borough located at 124 Pine Street, Burnside, PA 15721 until **1:00 PM local time, Monday, February 1, 2027**.

Bids received will be Publicly opened and read aloud after 1:00 PM at the place of bid opening, 65 East Third Street, Burnside, PA 15721.

Bids are requested for the following Contract(s): 2026-W1, Combination: General / Excavation / Plumbing / HVAC / Electrical & Controls

Scope

This project includes renovations to an existing on site building to allow movement of water treatment system equipment from existing on-site building to the renovated building.

Installation of new underground raw water piping from the existing well to the renovated building as well as new chlorine contact piping and interconnection to the Burnside Borough's water system. Plumbing and process piping work in the renovated building. Includes disconnecting, moving and installing items from the existing on-site building to the renovated building. Includes new electrical service entrance, conduit and wiring, renovated building power and lighting. Conduit and wiring from emergency generator to the renovated building and into the relocated Automatic Transfer Switch. Includes use of Owner's designated contractor for the relocation, installation and start-up of the existing proprietary alarm and communication system components.

Additional information

**Submission:** Bids will be received via either the PennBid.net website or hard copy hand delivered to the Burnside Borough located at 124 Pine Street, Burnside, PA 15721.

Bidding Documents may be obtained at no cost electronically at www.PennBid.net or may be purchased for **$250.00** (non-refundable)(includes only USPS regular mail), from the Issuing Office, Kleinfelder, 330 Innovation Blvd, Suite 305, State College, PA 16803.

A certified check or bank draft payable to the order of Burnside Borough, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid, shall be submitted with each bid. The Bidder shall include the fully completed *Non-Collusion Affidavit* and additional supporting documents with the bid.

Bids may be held by the Burnside Borough for up to 90 days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. The Burnside Borough reserves the right to reject any or all bids, to waive any irregularities, or to negotiate contract amounts.

This project is funded, in part, by funds from a Community Development Block Grant (CDBG). No less than minimum wages as required by the Federal Davis-Bacon Wage Requirements and listed in the Contract Documents must be paid to all on-site employees on this project.

The goals for this project are MBE 5% and WBE 3%; the Section 3 goal is 25% of man hours working on the project.

Documents

4 files

Subscribe to get these 4 documents.

Similar open bids

In Pennsylvania