City of Fort Worth (Texas) posted this ITB on Nov 25, 2026. Responses are due Dec 17, 2026. Category: Construction - Heavy & Civil. Solicitation number 27-0047.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Electronic bids for construction of the Midfield Area Pond D Expansion project at Meacham International Airport, City Project No. 107108 (“Project”) will be received by the City of Fort Worth via the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities, under the respective Project until **2:00 P.M. CST, Thursday, December 17, 2026**.
The major work will consist of the (approximate) following: Construction to expand the existing detention pond (Pond D) within the Midfield Area of Meacham International Airport, including existing storm drain demolition, jack and bore installation of 30” RCP under Taxiway Hotel, and earthwork for expansion of Pond D.
The major work will consist of the (approximate) following: Construction to expand the existing detention pond (Pond D) within the Midfield Area of Meacham International Airport, including existing storm drain demolition, jack and bore installation of 30” RCP under Taxiway Hotel, and earthwork for expansion of Pond D.
Items of Work
Phasing
DURING PERFORMANCE OF THIS PROJECT, THE AIRPORT RUNWAYS, TAXIWAYS, AND AIRCRAFT PARKING APRONS SHALL REMAIN IN USE BY AIRCRAFT TO THE MAXIMUM EXTENT POSSIBLE. THE PROJECT SHALL BE PHASED TO REDUCE OPERATIONAL IMPACTS AT THE AIRPORT.
Submission
All submissions must be **submitted electronically** prior to the close date and time under the respective Project via the Procurement Portal: https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities [...] No late bids/proposals shall be accepted. Bids delivered in any other manner than using the Bonfire Platform (Procurement Portal) will not be accepted or considered.
You must indicate your intent to bid to be able to submit a bid to the City.
Prequalification
Certain improvements included in this project must be performed by a contractor or designated subcontractor who is pre-qualified by the City at the time of bid opening. [...] Firms seeking pre-qualification, must submit the documentation identified in Section 00 45 11 on Section 00 45 13 *PREQUALIFICATION APPLICATION* at least **seven (7) calendar days prior to Bid opening** for review and, if qualified, acceptance.
Award
City will award a contract to the Bidder presenting the lowest price, qualifications and competencies considered. City reserves the right to waive irregularities and to accept or reject any or all bids.
Site Visit
[Each Bidder] Should visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work.
Subscribe to get these 4 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.