City of Denton (Texas) posted this RFP on Nov 25, 2026. Responses are due Dec 16, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-07 15:00. Solicitation number 9193.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Denton, Texas is accepting offers for maintenance of Texas Department of Transportation (TXDOT) installed street and thoroughfare lighting. Currently, the City of Denton is responsible for street lights along North Loop 288 to Post Oak Drive of which are a Type III distribution patterns. Respondents must be familiar with all aspects of streetlights and streetlight maintenance. Except where noted, only those streetlights installed by TXDOT, and within the City of Denton, Texas, are covered by the services requested in the scope of this contract. The lights included with this contract may change based on future decisions by Denton Municipal Electric.
Denton Municipal Electric (DME) shall be responsible for administration of the contract and maintaining the inventory of materials needed to successfully execute the tasks covered in this RFP. This includes poles, underground cable, overhead conductor, lamp fixtures, photocells, lighting contactors, connection cabinets, luminaires (TXDOT Specification), breakaway bases or any other materials needed for street lights.
Scope of Services
Parties agree that street light maintenance services shall include replacement streetlights and or street poles, customer service/dispatch, night patrols, circuit breakers, photocells, and spot re-lamping. Items outside of the scope of streetlight maintenance services include, but are not limited to, underground cable repair and/or replacement, leaning poles and pole painting.
[...]
Within two (2) months of project award, the Contractor shall have a real-time status of scheduled maintenance or night checks, service requests, and inventories, with the ability to add as built plans, and digital photos accessible via the City internet.
[...]
Repair Response
[...]
In the event extensive repairs are required, contractor shall perform the repairs as soon as reasonably possible. However, not longer than fourteen (14) days after knowledge of the outage.
[...]
The Contractor shall furnish all transportation, tools, equipment, machinery, barricading, all necessary safety and/or PPE requirements and all suitable appliances, requisite for the execution of this Contract [...]
The Contractor shall wholly own equipment required to perform this contract such as bucket truck, cranes and other such equipment.
[...]
Contractor will provide traffic control plans as necessary to be reviewed and approved by City of Denton Electric Division and obtain all permits through Texas Department of Transportation (TXDOT), prior to beginning repairs or maintenance.
[...]
Maintenance of Streetlights
[...]
Contractor shall provide monthly reports to verify response times of maintenance crews to light out calls and shall be attached with monthly invoice.
Submittal
The City of Denton will accept **electronic in Ionwave or hard copy submittals** until the date and time on the cover sheet of this solicitation. Any submission received after the date and/or hour set for solicitation opening will be returned unopened.
[...]
Contract Term
It is the intention of the City of Denton to award a contract for one (1) year, effective from date of award. The City and the Supplier shall have the option to renew this contract for an additional two (4) one-year periods.
[...]
At the sole option of the City of Denton, the Contract may be further extended as needed, not to exceed a total of six (6) months
Evaluation Criteria
| Criterion | Factor |
| --- | --- |
| Technical Experience & Qualifications | 30% |
| Staffing & Resources | 10% |
| Response Times & Service Levels | 10% |
| Safety program | 10% |
| Past Performance & References | 10% |
| Price, Total Cost of Ownership | 30% |
[...]
Provide a minimum of three governmental or transportation agency references.
[...]
A public opening will not be conducted with this process.