Utah Division of Wildlife Resources (Utah) posted this IFB on Nov 16, 2026. Responses are due Nov 23, 2026. Category: Construction - Heavy & Civil. Solicitation number AS27-128.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Bureau of Land Management (BLM), Cedar City Field Office is acquiring bids for fencing services to modify existing fence to wildlife friendly standards on up to approximately 9 miles of rangeland fence along the Pine Valley Road in Beaver County, UT. The specific project location is approximately 35 miles west of Milford, UT (see attached map).
Priority segments total approximately 6.63 miles with potential to add on an additional 2.32 miles if conditions allow. Bids should be submitted on a per mile basis.
The Contractor shall provide all necessary labor, approved equipment, certified personnel, and materials to retrofit existing rangeland fence to wildlife friendly standards.
The existing fence alignment shall be maintained throughout the project.
The fence shall be modified from existing status using the following wire spacing measured from ground level upward (see Figure 1):
The bottom wire must be smooth wire to allow wildlife passage. Remaining wires may be reused barbed or smooth wire as already present unless otherwise directed.
The contractor shall ensure all wires are properly tensioned and secured using wire clips. Any damaged wire sections shall be removed and replaced to ensure a consistent and functional fence line.
All reused materials must be installed in a manner consistent with safe and durable wildlife-friendly standards.
Ensure no section of fence is left down where livestock may cross pastures during construction.
Contractor will ensure each segment between fence posts is marked with a wildlife (sage grouse) marker which will be provided by BLM.
Contractor Responsibilities
This contract will be bid on a per-mile price. The per-mile price will be extended based on the number of miles to show a total project price. The total price shall include all labor, equipment, and materials necessary to complete the job, which includes all mobilization and operating costs. There will be no fuel surcharges or adjustments negotiated.
A contract will be awarded to the lowest responsive/responsible bidder who meets any experience and equipment requirements noted elsewhere in this solicitation.
A site visit will NOT be held prior to bidding. It is strongly recommended that each potential bidder inspect the site where services are to be performed and satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable.
The Project Manager must approve the use of all subcontractors in writing prior to their performance of any work on the project.
**Contract time:** Must be finished by December 20, 2026
The Contractor shall begin work within seven (7) calendar days from the effective date of the notice to proceed.
Questions related to this solicitation, specifications, or bidding procedures **MUST** be asked in writing on the Q&A board within the solicitation.