AS27-127 Babylon Fire Seeding

Active AS27-127 IFBLandscaping & AgricultureUtah Division of Wildlife Resources
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Utah Division of Wildlife Resources (Utah) posted this IFB on Nov 13, 2026. Responses are due Nov 20, 2026. Category: Landscaping & Agriculture. Solicitation number AS27-127.

Solicitation details

General information

Solicitation number
AS27-127
Notice type
IFB
Place of performance
Utah

Agency and category

Agency
Utah Division of Wildlife Resources
Category
017Landscaping & Agriculture
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The purpose of this IFB is to enter into a contract to provide: aerial seeding.

Utah Division of Wildlife Resources (DWR) and US Forest Service (USFS) are acquiring services for aerial seeding as part of the Babylon Fire seeding project. The work includes transport of the seed to the airport and aerial seeding the following project area:

  • Line Item 1: 2,660 acres aerial seeding
  • Line Item 2: 8,340 acres aerial seeding

Scope

The Babylon Fire seeding project is in San Juan County, Utah (see project area and vicinity maps). This project is located on Forest Service land in San Juan County, Utah. Only areas outlined on the project maps will be seeded.

Due to the size of the project, the short timeline, and very limited access to the project site drones will not be considered for this bid. Seeding will need to be done with manned aircraft only.

Furnishing all labor, equipment, supplies, and materials to aerial seed the project units. Contractor will need to provide enough labor and equipment to complete the work in the specified performance window. It is the contractor’s responsibility to ensure that the proper seed mix and application rate is followed as described in this contract.

  • Line Item 1 – Bulk pounds per acre = 8.78 lbs., Total Weight = 23,354.8 lbs.
  • Line Item 2 – Bulk pounds per acre = 8.78 lbs., Total Weight = 73,225.2 lbs.

Seed will be loaded in approximately 1,250 lb. totes. Contractor is responsible to coordinate and obtain the specified seed from the Utah Division of Wildlife Resource Seed Warehouse in Ephraim, Utah and transport seed to the airport of their choice. Contractor will be solely responsible for loading and unloading at the airport and loading all seed into broadcaster.

The aircraft must be equipped with a global positioning system that is used to establish flight lines for 100% coverage. DWR will provide to the Contractor an electronic file containing coordinate positions of treatment areas in an ARC/INFO GIS format. Contractor shall provide a Trimble, ARC/INFO or ARCVIEW electronic file in UTM projection North America Datum 1983 of treatment coverage upon completion of each treated area or as required by the Contracting Officer.

The Contractor shall provide a communication system so that contractor personnel engaged in the project at different locations can always communicate with each other and so that Government Project Inspectors may communicate with the contractor at any time to discuss performance matters.

The contractor will be expected to begin seeding by 8:00 a.m. to avoid windy conditions and minimize seed drift. The government reserves the right to postpone the seeding operation if wind speed exceeds 10 miles per hour.

Additional information

It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.

All questions must be submitted through U3P during the question and answer period. All other questions related to this solicitation, specifications, or bidding procedures **MUST** be asked in writing on the bidding hub.

A site visit will NOT be held prior to bidding. It is strongly recommended that each potential bidder inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable.

The contract should be completed between the time the contract is awarded and **November 30, 2026**. Due to the high demand on the GBRC seed warehouse to mix seed this fall, dates may change based on the ability to have the seed mix ready. Flexibility will be given on the contract time within reason.

Vendor must guarantee its pricing through completion of the project.

One lump-sum final payment will be made for the actual number of acres completed following a final inspection of the completed project, and consistent with the payment clause in the State’s standard terms and conditions.

Documents

5 files

Subscribe to get these 5 documents.

  • Att.-A-PO-Terms-and-Conditions (26).docx
    Download
  • Attachment B Scope of Work.docx
    Download
  • BabylonFireSeeding - KMZ.zip
    Download
  • BabylonFireSeedingMapb.pdf
    Download
  • Vendor Prerequisites - IFB Agency.pdf
    Download

Similar open bids

In Utah

More from Utah Division of Wildlife Resources

Open bids