Utah Division of Wildlife Resources (Utah) posted this IFB on Nov 23, 2026. Responses are due Dec 3, 2026. Category: Environmental Services. Solicitation number JH27-134.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Intensive cultural resource inventory (15-meter transects) and site revisits (within the APE but outside the survey area).
The lightning-caused Widemouth 2 Fire started July 27th, 2026, in the Widemouth drainage in Millard County. Over the following two months, the fire burned approximately 130k acres along the west side of the Pahvant Range near the towns of Kanosh and Fillmore. The fire was officially listed as 100% contained in early October. The wildfire resulted in major vegetation losses, affecting wildlife populations and livestock grazing, and increasing the risk of catastrophic flooding.
This is the first phase of the Widemouth 2 fire rehabilitation project and is focused on high-priority areas that require immediate rehabilitation. Other phases involving archaeological survey and site revisits will follow as other treatment areas are refined.
Specifically, the Project includes cultural resources identification and assessment tasks:
Period of Performance
No paper reporting is required for the Project. A single report is required to document all the tasks listed. [...] Deliverables (draft and final) will each include the report, site forms, GIS data, tabular data, and IF data, all according to UtSHPO and BLM guidance, standards, and templates (e.g. Isolated Occurrences template).
The Project must be led by an individual holding a Public Lands Policy Coordinating Office (PLPCO) Principal Investigator Permit to Conduct Archaeological Surveys.
WRI Contracting Model: Firm-fixed price/Lump sum. Cost modifications or change orders based upon unexpected or excessive findings will not be entertained.
The individual SOW project award will be made based upon a cumulative assessment which will take place at each project release. That assessment will combine the previously outlined Best Value score and a new “SOW Cost Point Award.” [...] 700 cost points are possible. The lowest cost bid will receive the full 700 points. Each higher bid will receive points based upon its percentage higher than the lowest bid.
Cumulative Assessment is calculated by: (AS24-114 Best Value score out of 300) + (“SOW Cost Point Award” out of 700). The highest point tally will receive the project contract at their submitted bid rate.
Invoicing for the Project will follow the standard Multiple Award for Archaeology contract schedule: 10% invoiced upon completion of pre-field literature review; 50% upon completion of fieldwork, including a preliminary report of fieldwork results as described above; 30% upon delivery of draft deliverables; final 10% upon full acceptance of final deliverables by the Agency Archaeologists.
All questions must be submitted through U3P during the question and answer period. [...] A bid that contains exceptions and/or additions to the Standard Terms and Conditions will be rejected and disqualified from this IFB.
Subscribe to get these 5 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.