Salt Lake City Department of Public Utilities (Utah) posted this RFQu on Nov 18, 2026. Responses are due Dec 9, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-02 14:00. Solicitation number 525003195.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Salt Lake City Department of Public Utilities (SLCDPU) (Owner) will be requesting Statements of Qualifications from CMGC organizations (Proposers) for the construction of the following MP12B and C - 500 South Capacity Upgrades (525003195) and for related pre-construction and procurement CMGC services.
Owner anticipates that the CMGC’s Contract Price will be approximately **$25-35M**.
The previous phase of this project installed a new sewer pump station and two 24-inch force mains discharging to the 500 South Sewer at Gladiola Street (3400 W). This project will intercept the existing 24-inch diameter 700 South force mains on the north side of the railroad tracks at Gladiola Street and will extend them from that location to a discharge point upstream of the 500 South Lift Station near Orange Street. The project includes construction of two of the three force mains, with the third being added as flow conditions demand.
Each tunnel/crossing or other critical points will include installation of all three force mains to avoid multiple construction and permitting efforts in the future. Major crossings include the Surplus Canal, a railroad corridor (one SLG&W track and three UPRR tracks), and I-215.
**Submission method:** Owner will receive Statements of Qualifications demonstrating the Proposer’s qualifications and ability to provide CMGC services via the Utah Public Procurement Place (U3P) website in accordance with the requirements outlined in the Prequalification Documents. To be considered, the SOQ is due through the U3P website no later than **2:00 PM on Wednesday, December 9, 2026 (MST)**. After that time, Owner will no longer accept Statements of Qualifications. Only SOQs submitted electronically through (U3P) BONFIRE will be accepted.
It’s the responsibility of the applicant to periodically check and download addenda(s), question and answer responses, or any additional information that may be posted during the advertisement period.
**Two-Step Process:** Selection of the Construction Manager will be made using a two-step process. Step One: The Owner will receive Statements of Qualification and evaluate these, along with other information, to develop a list of the most highly qualified Proposers. Step Two: Qualified Proposers will receive a Request for Proposals and will submit a detailed Proposal for the CMGC Contract for the Owner’s consideration. The Proposal and the previously submitted Statement of Qualifications will be used together to determine the final ranking of Proposers for award of the CMAR Contract. The Request for Qualifications includes details on the selection criteria and selection process.
**Insurance:** All liability insurance policies for the project shall include an endorsement naming the OWNER, ARCHITECT AND ENGINEER as additional insureds. See *Attachment C* for the required Contractor’s liability insurance and bonds.