City of Norfolk (Virginia) posted this IFB on Nov 11, 2026. Responses are due Dec 18, 2026. Category: Construction - Heavy & Civil. Solicitation number 20017.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The work includes the demolition, replacement, and relocation of electrical control systems and equipment from the pump station control room to the existing generator building. Also included are miscellaneous electrical and SCADA control work and all associated site work, including maintenance of traffic.
The work includes the demolition, replacement, and relocation of electrical control systems and equipment from the pump station control room to the existing generator building. Also included are miscellaneous electrical and SCADA control work and all associated site work, including maintenance of traffic.
The Contractor will be required to keep the pump station in operation to the maximum extent practical during construction. A bypass pumping system capable of handling a minimum of **2,000 GPM** will need to be designed, installed, and maintained by the Contractor for the period between the removal of existing electrical equipment and controls and the start-up and acceptance of the new electrical equipment and controls.
The Contractor will be required to clean the wet well prior to final completion of the project. Cleaning shall be done using the inlets in the travel lane while personnel access will be from the center of Tidewater Drive.