Procurement Exemption for MD Kinney Blowers

Active OpenGov-6c8cc92b Sole SourceUtilities & EnergyPierce County
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Pierce County (Washington) posted this Sole Source on Nov 18, 2026. Responses are due Dec 4, 2026. Category: Utilities & Energy. Questions are due 2026-11-25. Solicitation number OpenGov-6c8cc92b.

Solicitation details

General information

Solicitation number
OpenGov-6c8cc92b
Notice type
Sole Source
Place of performance
Washington
Questions due
2026-11-25

Agency and category

Agency
Pierce County
Category
018Utilities & Energy
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Based on a sole source exemption, the Pierce County Planning and Public Works Department intends to purchase equipment from Northwest Industrial Repair. The procurement exemption will be valid for 24 months, and the estimated cost of the purchases over the 24-month period is **$50,000.00**.

The County requires replacement MD Kinney blowers for the grit tank system and the Chambers Creek Wastewater Treatment Plant.

The system uses MD Kinney Blowers, and the County has determined that only MD Kinney Blowers have the specifications necessary to be compatible with the existing infrastructure.

The manufacturer, MD Kinney, has provided the County with a sole source letter indicating that Northwest Industrial Repair is the sole authorized distributor of MD Kinney Blowers in Washington State.

Scope

The goods to be purchased via this exemption include MD Kinney Blowers for the grit tanks and the Chambers Creek Waste Water Treatment Plant.

This equipment is necessary for continuity of operations within the Chambers Creek Waste Water Treatment Plant to keep the grit tanks fully functional.

The County has identified the following minimum requirements to meet its need:

1. Authorization by the manufacturer to sell MD Kinney blowers, parts, and related components in Pierce County.

Additional information

Any entity who believes they are qualified to meet the need identified in this public notice must submit a capability statement describing how the entity meets the above minimum requirements.

Capability statements must be submitted via the OpenGov platform. [...] Capability statements must be submitted in OpenGov and should use the .docx or .pdf file type, or any other standard file type that can be opened in Microsoft Word or Adobe Acrobat. There are no strict formatting requirements for capability statements.

The exemption will be valid for 24 months, and the purchases made under this exemption are estimated to cost **$50,000.00** over the 24-month period.

If the capability statement demonstrates that the submitter can meet the County's need, the County will cancel the public notice and proceed with a competitive procurement. If the County determines that the capability statement has not demonstrated that the submitter can meet the County's need, the County will proceed with the procurement exemption.

Documents

2 files

Subscribe to get these 2 documents.

  • MD_Kinney_Blowers_Justification.pdf
    Download
  • Procurement_Exemption_for_MD_Kinney_Blowers.pdf
    Download

Similar open bids

In Washington

More from Pierce County

Open bids