Bad River Band Of Lake Superior Tribe Of Chippewa Indians (Wisconsin) posted this RFP on Nov 12, 2026. Responses are due Dec 10, 2026. Category: Construction - Building. Questions are due 2026-11-20. Solicitation number BADRIVERNSN-2FC5238C.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Bad River Band of Lake Superior Tribe of Chippewa Indians is seeking proposals through solicitation for the design/buildout/remodel of a Bad River Men's Recovery House.
The Bad River Band of Lake Superior Chippewa is soliciting proposals from qualified firms/contractors for the design/buildout/remodel of a Bad River Men's House. The existing facility is located at 77750 US Highway 2, Odanah, Wisconsin.
The Bad River Health and Wellness is proposing to renovate an existing single-family residence into a Men's Recovery House. The house has been vacant since approximately 2019. The proposed work includes a remodel of the current space and buildout of the lower level (walkout basement). Work includes demolition of existing walls within the basement and remodel to include restroom, utility room, and bedrooms. Remodel of the upstairs to include an ADA compliant restroom, improvements to kitchen, installation of closets within bedrooms. HVAC and plumbing will also be updated including replacement/repair of existing water system, installation of new furnace and water heater, installation of fire sprinkler/suppressions system, and installation of interconnected smoke/fire detectors. Electrical system shall have additional circuits, lighting, and outlets per code for renovated spaces.
A community water connection and renovation of the existing septic system will be completed under separate projects. The existing driveway will also be upgraded under a separate project.
Description of Work
Sealed bids must be labeled 'Proposal Enclosed: Men's Recovery House' and submitted by close of business (4:30pm) **Thursday, December 10, 2026** by **certified mail, email, or personal delivery**.
Bid opening will be held at Chief Blackbird Center (Administration Building) on Friday, December 11, 2026 at 10:00am.
**Site visit required:** Firm/Contractor/bidder shall complete a site visit to the facility prior to submitting a proposal. Proposals will not be evaluated unless contractor has completed a site visit.
Proposals shall include at minimum the following items to be considered responsive:
1. Signed Bid Schedule – Appendix C
2. Qualifications as outlined above.
3. Proof of liability insurance in accordance with attached Appendix D
4. Indian Preference Documentation (if applicable)
5. Site Visit: Contractor must coordinate a site visit through Owner's contact listed above for proposal to be considered responsive.
Performance and Payment Bonds are required. Bid prices shall be guaranteed for a minimum of sixty (60) days from the bid due date.
The following will be considered in selecting a bidder/contractor to complete the work:
An award is expected 4-6 weeks after proposals are received. Substantially Complete (ready for final inspection): One hundred eighty (180) days after award.