Pre-Construction Site Preparation – Time Restricted – Boys & Girls Club

Active BADRIVERNSN-4B3665FF RFPConstruction - Heavy & CivilBad River Band Of Lake Superior Tribe Of Chippewa Indians
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Bad River Band Of Lake Superior Tribe Of Chippewa Indians (Wisconsin) posted this RFP on Oct 29, 2026. Responses are due Nov 18, 2026. Category: Construction - Heavy & Civil. Solicitation number BADRIVERNSN-4B3665FF.

Solicitation details

General information

Solicitation number
BADRIVERNSN-4B3665FF
Notice type
RFP
Place of performance
Wisconsin

Agency and category

Agency
Bad River Band Of Lake Superior Tribe Of Chippewa Indians
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Bad River Band of Lake Superior Tribe of Chippewa Indians is seeking proposals through solicitation for environmentally-aware horizontal construction tasks required to transform raw land into a stable, regulatory-compliant environment ready for foundations and vertical structures in preparation of new construction of a single-story 8,500 square foot Boys and Girls Club. The work must be done between November 21 – December 31, 2026 at the site on the Bad River Reservation in Odanah, Wisconsin.

Site Description

The area to be prepared is approximately 3 acres of parcel with description of NW1/4, SW1/4, NE1/4 of Section 32, T48N, R2W along Abinoojiiyag Road, north of the Bad River Head Start Building, on the Bad River Reservation in Ashland County, Wisconsin. ALTA survey, wetland delineation map, and Environmental report outlining conditions addended. Substrate is clay soil on high water table. Soil surveys will have been completed and the area to be worked will be clearly staked. Environmental permits for the work will be in place and will need to be followed. See map, permits, reports for additional reference.

Scope

  • Clearing and Grubbing - 10" diameter trunks and larger to be hauled to Tribal sawmill site. Other woody brush hauled away
  • Topsoil Stripping
  • Erosion and Sediment Control
  • Rough grading
  • Mass Excavation
  • Soil Stabilization and Compaction
  • Underground Utility Installation
  • Pad Certification
  • Base Preparation

There is no demolition work to be done. A detention pond will need to be constructed later but is NOT within the scope of [...]

Additional information

We are unable to post the Site Clearing & Grading Plan at time of this publication. It will be made available in the form of pdf files and posted to this web page as soon as possible and prior to **November 21, 2026**. Other types of files will be made available upon request.

Site Visit

Potential bidders wishing to tour the site are invited to a site viewing on **November 4, 2026 at 10 am**. Meet at the Chief Blackbird Center, 72682 Maple Street, Odanah and ask for Ben or Beth at the front door reception desk. All questions asked and answered will be posted on this site on November 5th, 2026.

Bad River reserves the right to reject all bids.

Documents

1 file

Sign up free to get this document.

  • Pre-Construction Site Preparation – Time Restricted – Boys & Girls Club.pdf
    Download

Similar open bids

In Wisconsin

More from Bad River Band Of Lake Superior Tribe Of Chippewa Indians

Open bids