West Allis City Hall Renovation Architectural Services

Active EN-26024 RFPArchitecture & EngineeringCity of West Allis
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of West Allis (Wisconsin) posted this RFP on Nov 20, 2026. Responses are due Jan 8, 2027. Category: Architecture & Engineering. Questions are due 2026-12-07 16:00. Solicitation number EN-26024.

Solicitation details

General information

Solicitation number
EN-26024
Notice type
RFP
Place of performance
Wisconsin
Questions due
2026-12-07 16:00

Agency and category

Agency
City of West Allis
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City is requesting proposals from qualified architectural firms for the creative and efficient design, permitting, preparation of bid documents, bidding process management, and all other necessary documents for the renovation of the existing City Hall facility at 7525 W. Greenfield Avenue. Due to the relocation of the engineering and information technology departments, and aging building infrastructure, there is a need for renovation of the existing City Hall to facilitate efficient interoperation of departments along with safe and secure interactions with the public during office hours and public meetings. The site consists of the existing 3-story building with a partially below grade lower level. Each level is approximately 13,000 square feet.

Scope

Architectural Requirements

The architectural plans shall provide the following:

  • Development of construction plans and specifications for the renovation of the existing city hall facility at 7525 W. Greenfield Ave. which is to include but is not limited to customer service areas, common council chambers, large and small meeting/conference rooms, office spaces for each department, elected official office/meeting rooms, storage spaces, space for the existing print shop that has several large printers, space for voting and central count, employee gathering spaces one of which should have kitchen amenities, exercise room, mail table/room, public and staff restrooms, public and staff vehicle parking, generator, garbage and recycle enclosure.
  • Coordinate with internal staff for building operations, including but not limited to, information technology, building maintenance, workflow, access, etc.
  • The parking lot should be reviewed for logistics of staff parking, short visit parking, longer term parking for meeting attendance, voting, garbage/recycle collection, and generator location. The parking lot has a dedicated alley connected to it and must remain open to alley traffic.
  • Incorporate as many LEED or sustainability features as practical. Give the City options to decide if such features are practical.
  • Design a sign for the facility.
  • Coordinate building architecture with City staff to achieve integration with existing City buildings and surrounding sites.
  • Update budget requirements for all items of the project.

Engineering Requirements

The site plans and engineering plans shall include the following:

  • Master site layout to incorporate any new construction, roadways, parking areas, access points, etc.
  • Traffic flows on site and entrances and exits onto S. 76th and S. 75th Streets and alley.
  • Stormwater management plan, if needed, to meet MMSD, WDNR, and City requirements.
  • Grading plan and erosion control plan.
  • Fire protection plan with permitting required through the West Allis Fire Department.
  • Lighting plan for the site including photometric modeling.
  • Landscape plan for the site where existing landscape areas are removed.

Additional Requirements

  • Identify and apply for grant opportunities which include, but are not limited to, energy efficiencies, green infrastructure, etc.
  • The existing facilities shall remain functional and house operations throughout construction.
  • Building and site plan approval through the Planning Commission, and the Committee of the Whole.
  • Bidding, bid review and award recommendation are required.

Deliverables

  • Electronic copies (.pdf format) of plans at 30%, 60% and 90% plans with updated estimates at each milestone.
  • Mounted, large format display copies of 90% plans.
  • Electronic and hard copies of final plans for bidding.
  • Electronic and hard copies of building specifications for bidding.
  • Electronic .dwg files for the City's records.

Additional information

All proposals shall be downloaded and submitted through our online bidding platform, **Bonfire** (https://westalliswi.bonfirehub.com/). Proposals must be received by the West Allis Bonfire bid portal no later than **4:00 pm CST, Friday, January 8, 2027**. Proposals received after the due date will not be considered by the City.

Provide a cost for all services performed in a separate online submittal. The most qualified firms will be chosen prior to viewing costs. Once the most qualified firms are chosen, firms will be notified by Friday January 15, 2027. Interviews will be scheduled for Tuesday, January 26, 2027.

The award resulting from this RFP will be made to the consultant that submits the response that, in the City's opinion, best serves the overall interests of the City. Factors that will be considered in the evaluation may include but are not limited to:

  • Proven ability of firm to provide similar products within established guidelines;
  • A demonstrated clear understanding of the City's needs;
  • Progressive ideas and demonstrated ability to "think outside of the box" by providing innovative analysis or solutions;
  • Evaluation of reference responses;
  • Qualification of personnel assigned to the project and ability to accomplish the specified work;
  • The costs of products and services.

The City intends to utilize the AIA standard architect contract forms subject to additions and deletions by the City Attorney.

The Notice of Award and Notice to Proceed are expected to be sent to the awarded vendor mid to late February 2027.

Documents

1 file

Subscribe to get this document.

  • West Allis City Hall Renovation .pdf
    Download

Similar open bids

In Wisconsin